General information

IMO:
8709951
MMSI:
371729000
Callsign:
3EGU3
Width:
19.0 m
Length:
83.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Panama
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
227.9° / -14.0
Heading:
298.0° / -14.0
Speed:
Max speed:
Status:
moored
Location:
Batam (ASL Shipyard - Berth Area 01)
Area:
South China Sea
Last seen:
2024-03-19
9 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
9 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-03-14
2024-03-19
5d 8h 23m
2023-08-21
2023-11-09
80d 4h 11m
2023-07-26
2023-07-28
1d 21h 17m
2023-07-04
2023-07-14
10d 4h 7m
2023-03-28
2023-03-28
11h 38m
2023-01-10
2023-01-11
16h 20m
2022-12-28
2022-12-30
2d 1h 23m
2022-12-16
2022-12-16
5h 44m
2022-12-12
2022-12-16
3d 11h 16m
2022-12-06
2022-12-12
6d 4h 23m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Hong Kong Approach
2023-02-11
Enter
Hong Kong Approach
2023-02-10
Leave
Hong Kong Approach
2022-12-24
Enter
Hong Kong Approach
2022-12-16
Leave
Hong Kong Approach
2022-12-16
Enter
Hong Kong Approach
2022-12-06
Leave
Kukup Island
2022-04-19
Leave
Note: All times are in UTC

Latest news

BGP Pioneer mobilises to Peru

Fri May 27 10:54:36 CEST 2011 Timsen

Gold Oil will start a marine 3D seismic survey over Block Z34 offshore Peru early July 2011. The Peruvian Ministry of Mining and Energy recently approved the environmental permit covering Block Z34 that covers a maximum of 808 square kilometers. Gold Oil signed a letter of intent on May 26, 2011, with BGP Geoexplorer PTE Ltd to hire the BGP Pioneer vessel for a 500 square kilometers survey over the southern part of the licence area. This initial survey comprises the first phase of 3D seismic over the licence and another of approximately 1,100 square kilometers will be required to evaluate the northern area of this large and prospective block. The "BGP Pioneer" will mobilize shortly to the operations area. Sailing to Peru will take approximately 20 days and it is expected that the vessel will commence operations, after local clearances, around early July 2011. Total acquisition time is expected to be approximately 30 days from the start of operations.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data