General information

IMO:
8721442
MMSI:
613941600
Callsign:
TJM0081
Width:
13.0 m
Length:
116.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Cameroon
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
318.2° / 4.0
Heading:
319.0° / 4.0
Speed:
Max speed:
Status:
moving
Area:
Black Sea
Last seen:
2023-06-02
36 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
24 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2023-04-10
2023-04-14
4d 12h 38m
2023-04-02
2023-04-06
4d 6h 57m
2023-03-24
2023-03-25
1d 6h 16m
2023-03-23
2023-03-24
1d 8m
2023-02-12
2023-02-13
1d 8h 38m
2023-02-03
2023-02-05
1d 16h 42m
2023-01-25
2023-01-27
1d 19h 19m
2023-01-21
2023-01-25
4d 1h 20m
2022-12-05
2022-12-07
1d 5h 54m
2022-11-24
2022-11-26
1d 12h 2m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Bosphorus Bridge 2
2023-03-29
Leave
Bosphorus Bridge 1
2023-03-29
Leave
Bosphorus Bridge 1
2023-03-13
Enter
Bosphorus Bridge 2
2023-03-13
Enter
Bosphorus Bridge 2
2023-02-19
Leave
Bosphorus Bridge 1
2023-02-19
Leave
Bosphorus Bridge 1
2023-02-03
Enter
Note: All times are in UTC

Latest news

Technical failure in Bosphorus

Sun Jan 31 12:44:53 CET 2021 Timsen

The 'Leda', while en route from Hereke to Kavkaz, suffered a technical failure at Uskudar point in the Istanbul Strait on Jan 30, 2021, at 10 a.m. The vessel returned to Istanbul anchorage, under own power and dropped anchor at noon. The crew carried out repairs, and the ship resumed its voyage with an ETA as of Feb 3.

Cargo ship grounded on Don

Thu Apr 12 18:35:29 CEST 2018 Timsen

The "Leda" ran aground on Apr 11, 2018, at 04.10 a.m. on the river Don near buoy 121 at Azov. The ship got stuck while sailing downstream with a pilot on board and a cargo of 2.436 tons of scrap metal on board, bound from Rostov for Samsun. Several attempts to refloat the "Leda" with the help of two tugs failed, now a more powerful ship was contracted by the owner which refloated the vessel on Apr 16.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data