General information

IMO:
9381990
MMSI:
511100803
Callsign:
T8A4015
Width:
24.0 m
Length:
92.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Palau
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
267.7° / -1.0
Heading:
235.0° / -1.0
Speed:
Max speed:
Status:
moored
Location:
Warri (Warri Port)
Area:
Nigeria
Last seen:
2024-04-26
3 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
5 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-04-12
2024-04-25
12d 13h 27m
2024-04-10
2024-04-12
1d 16h 22m
2024-03-12
2024-03-15
3d 6h 15m
2024-03-03
2024-03-04
23h 40m
2024-01-25
2024-03-03
38d 3h 11m
2024-01-18
2024-01-18
1h 6m
2023-03-18
2023-03-20
1d 20h 49m
2023-02-28
2023-03-18
18d 5h 16m
2023-01-19
2023-01-20
16h 20m
2022-12-23
2023-01-19
26d 11h 37m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Canary Islands
2024-03-25
Enter
Fuerteventura
2024-03-25
Enter
Strait of Gibraltar
2024-03-22
Enter
Isla de Alboran
2024-03-22
Leave
El-Jazair
2024-03-20
Enter
Sizilien
2024-03-18
Leave
Pantelleria East
2024-03-18
Leave
Note: All times are in UTC

Latest news

Blue Ship cited by USA for work on Nord Stream 2

Tue Nov 23 18:05:47 CET 2021 Timsen

The USA imposed sanctions on the 'Marlin' for its involvement in the construction of the Nord Stream 2 gas pipeline, as the Biden administration looks to exert more pressure on Russia without antagonizing Germany. In a report sent to Congress on Nov 22, 2021, the administration designated the Transadria Ltd., a Cyprus-based entity believed to be a Russian shell company, over pipeline work done by the 'Marlin', according to a statement from Secretary of State Antony Blinken. Another vessel, the 'Blue Ship', was cited for its work on the pipeline but not sanctioned because it belongs to an entity affiliated with the German government. The construction of the pipeline was finished in September, and the first of two lines is already filled with gas. While the U.S. has longed opposed the project, it’s extending its sanctions list without provoking German leaders who are determined to see the project through. The two vessels were included in a report that the administration is required to send to Congress every 90 days as part of a law that was passed in 2020 and is meant to slow or halt completion of the pipeline.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data