General information

IMO:
MMSI:
244750292
Callsign:
PB5242
Width:
12.0 m
Length:
111.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Netherlands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
360.0° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moored
Location:
Weil am Rhein (Kleinhüningen)
Area:
Germany
Last seen:
2020-01-16
4 days ago
Source:
T-AIS
Destination:
ETA:
Max Draught:
Last drought:
Last update:
4 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2020-01-15
2020-01-17
2d 4h 38m
2020-01-08
2020-01-15
7d 4h 30m
2019-12-06
2020-01-08
32d 9h 29m
2019-12-05
2019-12-06
1d 6h 39m
2019-11-05
2019-12-05
29d 10h 57m
2019-10-26
2019-11-05
10d 14h 40m
2019-10-23
2019-10-26
2d 15h 16m
2019-10-12
2019-10-23
11d 1m
2019-10-10
2019-10-12
1d 18h 19m
2019-09-24
2019-09-28
3d 6h 5m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Weil Rhein Nord
2019-11-05
Enter
Weil Rhein Nord
2019-10-12
Leave
Weil Rhein Nord
2019-09-25
Enter
Weil Rhein Nord
2019-07-03
Enter
Weil Rhein Nord
2019-02-12
Enter
Schleuse Breisach Sued
2018-11-20
Enter
Schleuse Breisach Sued
2018-11-10
Leave
Note: All times are in UTC

Latest news

Barge out of control on the Rhine

Fri Jul 19 09:29:48 CEST 2019 Timsen

The "Camaro VI", 2291 ts (EU-No.: 02336362), which had just sailed with a cargo of containers from Birsfelden, suffered a main engine failure and was disabled in Basel on July 18, 2019, at 6.30 p.m. and allided with two Rhine bridges. Only the bow thruster had kept working. The fire brigade was alerted and escorted the ship with a fire boat while it drifted downstream and first allided with the Middle Bridge and then hit a pillar of the Johanniter Bridge. Underneath the Three Roses Bridge the crew of two along with the embarked oilot managed to stop the drift and secure the vessel at the shore. The police barred the Rhine for ship traffic until the barge was safely berthed in Basel port. She left the port on July 19 at 6.25 p.m. and headed to Weil upon Rhine, where it berthed at 8.45 p.m. and remained stationary since. German reports with photos: https://www.20min.ch/schweiz/basel/story/Frachter-kollidiert-mit-Bruecke-in-Basel-14078131 https://telebasel.ch/2019/07/18/frachtschiff-verliert-kontrolle-und-rammt-zwei-bruecken/

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data