General information

IMO:
9455739
MMSI:
538008843
Callsign:
V7A2821
Width:
32.0 m
Length:
195.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Marshall Islands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
180.7° / 0.0
Heading:
179.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Golfo de California
Last seen:
2024-03-24
4 days ago
 
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 days ago 
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-03-23
2024-03-24
1d 4h
2024-03-13
2024-03-13
3h 13m
2024-03-13
2024-03-13
3h 6m
2024-03-12
2024-03-13
23h 41m
2024-02-23
2024-02-24
22h 51m
2024-02-06
2024-02-08
2d 11h
2024-01-13
2024-01-18
4d 13h 57m
2024-01-07
2024-01-09
2d 7h 51m
2024-01-04
2024-01-06
2d 15h 20m
2023-12-21
2023-12-23
2d 20h 27m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Balboa Approach
2024-03-14
Enter
Puente de las Americas
2024-03-13
Enter
Miraflores Locks
2024-03-13
Enter
Gatun Locks
2024-03-13
Enter
Colon Approach
2024-03-13
Enter
Dover
2024-02-25
Enter
Calais
2024-02-24
Enter
Note: All times are in UTC

Latest news

Blackout in Suez Canal

Fri Feb 15 19:04:27 CET 2019 Timsen

The "Pomer" suffered am engine blackout, while transiting the Suez Canal in a northbound convoy on Feb 15, 2019, at 7.30 a.m. below the Great Bitter Lake. The tanker which was enroute from Dumai to Taman and had sailed from Suez at 7 a.m., blocked ship traffic in both directions, so that several vessels following the vessel had to wait until tugs moved the "Pomer" to the Great Bitter Lake.

Vessel detained due to unpaid wages

Mon Oct 15 13:02:35 CEST 2018 Timsen

The "Pomer" ship was detained by the authorities in Australia's Gladstone port due to a delay in the payment of salaries to the vessel's crew. The ship was detained by the Australian authorities although the salaries were paid before its arrival in the port on Oct 12, 2018. The ship will be released once the requested information on the wages payment has been provided by the respective banks. The detention of the vessel did not affect the smooth running of planned commercial and other activities in the Gladstone port.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data