General information

IMO:
9406647
MMSI:
248431000
Callsign:
9HA2362
Width:
40.0 m
Length:
300.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Malta
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
308.0° / 0.0
Heading:
307.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Red Sea
Last seen:
2021-01-22
1 day ago
 
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1 day ago 
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2021-01-16
2021-01-17
22h 24m
2021-01-14
2021-01-15
1d 1h 8m
2021-01-11
2021-01-12
19h 13m
2021-01-07
2021-01-08
19h 40m
2021-01-06
2021-01-06
11h 15m
2020-12-30
2020-12-30
10h 38m
2020-12-28
2020-12-29
18h 17m
2020-12-21
2020-12-21
19h 1m
2020-12-18
2020-12-19
1d 8h 24m
2020-12-15
2020-12-15
16h 52m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Gulf of Kachchh
2021-01-17
Enter
Gulf of Kachchh
2021-01-16
Leave
Strait of Hormuz
2021-01-09
Leave
Strait of Hormuz
2021-01-05
Enter
Jeddah South
2021-01-01
Enter
Jeddah North
2020-12-30
Enter
Suez
2020-12-25
Enter
Note: All times are in UTC

Latest news

The CMA CGM RACINE was the first vessel to cross the New East Port Said side Channel

Sat Feb 27 12:09:34 CET 2016 arnekiel

CMA CGM, a leading worldwide shipping Group, is pleased to announce that the CMA CGM RACINE was the first vessel to cross the New East Port Said side Channel, during the Opening ceremony held on February, 24th. For this special occasion, Chérif Ismaïl, Egyptian Prime Minister, Saad El-Giuchy, Egyptian Minister of Transport, and Admiral Mohab Mamish, Chairman of the Suez Canal Authority were present. Thanks to this new side channel, vessels will have a 24-hour access to East Port Said instead of current 8-hour access. This will bring much more flexibility on berthing windows and less restriction due to the Suez Canal convoy for ships who want to sail directly to the Mediterranean Sea or to berth. The project was concluded in November 2015 and completed within a few months. The new channel is 9km long, 250m width and 18m depth. Vessels up to 16.6m draft are able to cross it.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data