General information

IMO:
8714114
MMSI:
214182667
Callsign:
ER2667
Width:
16.0 m
Length:
106.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Moldova
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Anchored
Course:
0.1° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moored
Area:
Black Sea
Last seen:
2021-06-22
3 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
6 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2021-06-12
2021-06-18
5d 18h 28m
2021-06-09
2021-06-10
1d 15h 41m
2021-06-05
2021-06-06
5h 16m
2021-05-28
2021-06-04
7d 1h 20m
2021-05-23
2021-05-26
2d 19h 59m
2021-05-22
2021-05-23
1d 4h 5m
2021-05-07
2021-05-08
12h 32m
2021-05-03
2021-05-06
2d 9h 21m
2021-04-27
2021-04-29
1d 23h 16m
2021-04-23
2021-04-26
2d 13h 46m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Bosphorus Bridge 2
2021-06-19
Leave
Bosphorus Bridge 1
2021-06-18
Leave
Bosphorus Bridge 1
2021-06-05
Enter
Bosphorus Bridge 2
2021-06-05
Enter
Bosphorus Bridge 2
2021-05-27
Leave
Bosphorus Bridge 1
2021-05-27
Leave
Bosphorus Bridge 1
2021-05-20
Enter
Note: All times are in UTC

Latest news

Navigation system failure in Zonguldak

Tue Dec 22 12:25:35 CET 2020 Timsen

The 'Gabri S' suffered a navigation system failure in Zonguldak on Dec 18, 2020, involving a failure of the echo sounder, the speed indicator and voyage data recorder. The vessel's departure permission was temporarily canceled by the harbour master until completion of repairs by a shore-based technical support team. Upon completion of repairs, state surveyors attended onboard and verified the repair status with satisfactory results.

Technical failure in Eregli

Thu Dec 20 18:45:47 CET 2018 Timsen

The "Gabri S" suffered a technical failure of the emergency support systems at Eregli on Dec 17, 2018. It had arrived in port, coming from Nemrut Bay, on Dec 15. The vessel's departure permission has been cancelled by the port master until the completion of permanent repairs. A state surveyor will attend on board, in order to verify the final repair status. The repairs were being carried out by the crew. The vessel remained docked in the inner port in Eregli until Dec 22 at 11 a.m. and then sailed to Constantza, where it berthed on Dec 23 at 2.35 p.m.

Sold

Mon May 09 10:20:23 CEST 2016 arnekiel

Sold to undisclosed buyers for $800,000

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data