General information

IMO:
MMSI:
235053644
Callsign:
MUMN
Width:
6.0 m
Length:
26.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tug
Ship type:
Flag:
United Kingdom
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Restricted movement
Course:
230.8° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moving
Area:
United Kingdom
Last seen:
2025-05-02
1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
5 min ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2025-05-02
2025-05-02
3h 17m
2025-05-01
2025-05-02
17h 33m
2025-05-01
2025-05-01
4h 49m
2025-04-30
2025-05-01
16h 6m
2025-04-29
2025-04-30
14h 15m
2025-04-29
2025-04-29
3h 6m
2025-04-29
2025-04-29
1h 41m
2025-04-28
2025-04-29
16h 58m
2025-04-28
2025-04-28
2h 53m
2025-04-25
2025-04-28
2d 18h 47m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Northfleet
2025-05-01
Leave
Gravesend
2025-05-01
Enter
Gravesend
2025-05-01
Leave
Northfleet
2025-05-01
Enter
Northfleet
2025-04-30
Leave
Gravesend
2025-04-30
Enter
Gravesend
2025-04-30
Leave
Note: All times are in UTC

Latest news

Damaged tug still on slip in Denton

Fri Dec 21 10:31:56 CET 2012 Timsen

Already on Nov 15, 2012, at 6.00 a.m. the Malta flagged cargo m/v "Amber", leaving Tilbury Power Station suffered engine failure. The vessel subsequently went aground upstream of the PLA’s Denton Wharf base, having struck several moorings to which barges and tugs were secured and damaging the tugs "Mersina" and "Recruit". The Port of London Authority (PLA) managed the response to the incident from its London Port Control Centre at Gravesend. A PLA harbour service launch was on scene along with members of the PLA Marine Services team who are in the process of re-securing a barge and the "Recruit" and "Mersina" which had gone adrift. The "Amber" was re-floated at 8.45 a.m. and berthed alongside Tilbury Landing Stage before moving into Tilbury Dock for inspection and repairs in the afternoon. The tugs and barge which were adrift earlier were secured. The "Mersina" remains on Denton Slipway to date, it had suffered damage at the shaft. The "Recruit" was threatened to become a write off. The "Amber" left Tilbury again on Nov 30.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data