General information

IMO:
9070503
MMSI:
511434000
Callsign:
9HCJ9
Width:
15.0 m
Length:
85.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Palau
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
147.2° / 0.0
Heading:
144.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Ionian Sea
Last seen:
2021-06-24
24 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
28 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2021-06-14
2021-06-15
22h 8m
2021-06-05
2021-06-06
1d 3h 42m
2021-06-04
2021-06-05
22h 43m
2021-05-22
2021-05-26
4d 6h 55m
2021-05-14
2021-05-21
7d 11h 29m
2021-05-08
2021-05-11
2d 16h 56m
2021-04-30
2021-05-01
15h 15m
2021-04-16
2021-04-25
9d 3h 10m
2021-04-12
2021-04-16
3d 23h 43m
2021-04-09
2021-04-10
21h 27m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Marmara Island
2021-06-07
Enter
Marmara Island
2021-06-04
Leave
Marmara Island
2021-05-29
Enter
Bosphorus Bridge 1
2021-05-29
Enter
Bosphorus Bridge 2
2021-05-28
Enter
Bosphorus Bridge 2
2021-05-03
Leave
Bosphorus Bridge 1
2021-05-03
Leave
Note: All times are in UTC

Latest news

Oil spill during bunkering

Mon Mar 11 21:56:17 CET 2019 Timsen

The "Haksa" caused an oil spill during bunker supply operations at Derince port on March 8, 2019. A pollution prevention operation was started by the port authority along with local municipality teams. Derince Safiport was closed to in and outgoing vessel traffic by the harbour master until the completion of fuel removal. An ooncident investigation file was placed and a fine imposed due to a breach of pollution prevention rules. The vessel's departure permission was cancelled until the fule was removed and the payment of the pollution fine. The vessel left Derince on March 10 at 6.25 a.m.

Repairs in final stage

Tue Sep 04 09:49:43 CEST 2018 Timsen

While steel replacement has been completed by the shipyard teams in Tuzla, the ship remained stationary in pos. 40° 50.88' N 029° 17.38' E. Final control and tightness tests were being conducted under the supervision of class surveyors. The ship sailed on Oct 4.

Damaged ship arrived in Tuzla under tow

Sun Jul 29 14:41:20 CEST 2018 Timsen

The "Haksa" arrived at the Tuzla shipyard area in the morning of July 27. Upon completion of arrival formalities, the vessel entered the shipyard in the evening.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data