General information

IMO:
9652832
MMSI:
235099235
Callsign:
2GOT8
Width:
12.0 m
Length:
43.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
United Kingdom
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
295.4° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
waiting
Area:
Inner Seas
Last seen:
2025-07-17
1 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
6 min ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-10-13
2024-10-14
15h 8m
2024-10-09
2024-10-09
16m
2024-09-21
2024-09-22
13h 38m
2023-10-14
2023-10-15
13h 57m
2023-10-12
2023-10-12
33m
2023-10-11
2023-10-12
23h 3m
2023-09-20
2023-10-11
20d 21h 29m
2023-09-17
2023-09-18
12h 24m
2022-10-21
2022-10-22
14h 52m
2022-09-21
2022-10-19
27d 21h 25m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Sailings cancelled due to technical issue

Thu Jul 17 13:53:15 CEST 2025 Timsen

Due to a technical issue on the 'Hallaig', serving on the route Sconser-Raasay, on July 17, the scheduled 07:55 a.m. sailing departing from Raasay and the 08:25 a.m. sailing departing from Sconser had to be cancelled. The ship was sidelined in Raasay for repairs. While the investigations into the issue were ongoing, also the the 08:55 a.n. sailing departing Raasay and the 09:25 a.m. sailing departing Sconser were cancelled. After troubleshooting, the ferry returned to service with a delayed 08:55 a.m. sailing departing from the port of Raasay. The 'Hallaig' operated a shuttle service. The vessel intended to go back to timetable at 12:15 p.m.

Ferry suffered technical issue

Mon Feb 03 12:18:27 CET 2025 Timsen

Pending attendance of shore-based engineers, weather restrictions have been placed on the 'Hallaig', serving on the route Raasay-Sconser, on Feb 2, 2025.In order to provide additional capacity, the 'Hallaig' operated the following additional sailings: Departure Raasay – 09:00 a.m. Departure Sconser – 09:30 a.m. After engineers have attended the ship, and the technical issue has been resolved, the service resumed with the departure from Raasay at 04:30 p.m. and at 5:00 p.m. from Sconser.

Battery ferry forced to sail with diesel after failure

Sat Jan 13 14:05:51 CET 2024 Timsen

The 'Hallaig', which had suffered a battery failure and was taken out of service in Raasay on Sep 7, 2023, has been forced to run exclusively on diesel fuel for some time and will continue to do so well into the year 2025. Officials expected repairs to the battery to be completed no earlier than April 2025, at a cost of 1,5 million Euros.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data