General information

IMO:
9164835
MMSI:
563009300
Callsign:
9V3160
Width:
60.0 m
Length:
333.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Singapore
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
358.6° / -4.0
Heading:
31.0° / -4.0
Speed:
Max speed:
Status:
moored
Location:
Sankofa and Gye Nyame Offshore Terminal (Sankofa and Gye Nyame Offshore Terminal)
Area:
Gulf of Guinea
Last seen:
2020-02-09
1562 days ago
 
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1562 days ago 
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2017-09-07
2020-02-09
884d 13h 35m
2017-01-10
2017-01-13
3d 8h 28m
2017-01-10
2017-02-16
37d 1h 6m
2014-11-13
2014-12-27
44d 8h 40m
2014-10-31
2014-11-04
3d 16h 38m
2014-04-27
2014-04-27
12h 33m
2014-04-18
2014-04-18
6h 5m
2014-04-16
2014-04-18
1d 15h 47m
2014-04-15
2014-04-15
2014-02-03
2014-02-04
1d 15h 9m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Yinson Ghana FPSO achieves first oil in record time

Tue May 23 07:42:17 CEST 2017 arnekiel

Yinson Holdings said its FPSO unit has produced first oil in record time-to-market for its client in Ghana. The FPSO unit will produce up to 85,000 barrels of oil equivalent per day through 18 underwater wells, the company said. “Earlier this year, we celebrated the timely completion of conversion works on the FPSO unit John Agyekum Kufuor (JAK). Today, we are proud to announce that we have produced first oil ahead of schedule for our client Eni Ghana,” Yinson’s group executive chairman Lim Han Weng said. The FPSO unit is operating at the Offshore Cape Three Points that covers three oil and gas fields located about 60km offshore Ghana’s west coast. The integrated oil and gas development fields have a combined 40bn cu m of non-associated gas and 500m barrels of oil. http://www.seatrade-maritime.com/news/middle-east-africa/yinson-ghana-fpso-achieves-first-oil-in-record-time.html

Keppel Shipyard to deliver first FPSO of the year

Fri Feb 03 10:24:28 CET 2017 arnekiel

February 3 - Keppel Offshore & Marine's (Keppel O&M) wholly-owned subsidiary Keppel Shipyard Ltd (Keppel Shipyard) is on track to deliver a Floating Production Storage and Offloading (FPSO) vessel to Yinson Production (West Africa) Pte Ltd (Yinson), a wholly-owned subsidiary of Yinson Holdings Berhad, safely, on time and on budget, the company said in its press release. The spread-moored FPSO unit was named John Agyekum Kufuor during a naming ceremony held at Keppel Shipyard this morning. It will be chartered by ENI Ghana Exploration & Production Limited (ENI Ghana) to process oil and gas from the Offshore Cape Three Points (OCTP) block located in Offshore Ghana. FPSO John Agyekum Kufuor has a storage capacity of 1.7 million barrels, with an oil processing capacity of 58,000 barrels per day. It has a design life of 20 years without dry docking and can be moored in an average water depth of 1,000m with a total topside weight of almost 15,000 tonnes. http://en.portnews.ru/news/233693/

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data