General information

IMO:
9286231
MMSI:
636021393
Callsign:
D5VF6
Width:
43.0 m
Length:
334.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Liberia
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
131.8° / 0.0
Heading:
293.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Alboran Sea
Last seen:
2025-09-19
1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2025-09-16
2025-09-17
1d 9h 30m
2025-09-14
2025-09-15
16h 1m
2025-09-12
2025-09-13
18h 17m
2025-09-09
2025-09-12
2d 16h 2m
2025-09-06
2025-09-08
2d 6h 43m
2025-09-04
2025-09-05
1d 9h 53m
2025-09-02
2025-09-02
17h 27m
2025-08-28
2025-08-29
18h 43m
2025-08-17
2025-08-18
10h 13m
2025-08-14
2025-08-15
20h 23m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Isla de Alboran
2025-09-18
Leave
Genoa Approach
2025-09-13
Enter
Genoa Approach
2025-09-12
Leave
Lipari Island
2025-09-04
Leave
Isla de Alboran
2025-08-31
Enter
Strait of Gibraltar
2025-08-31
Leave
Canary Islands
2025-08-29
Leave
Note: All times are in UTC

Latest news

CMA CGM HUGO will be first ship on the new CMA CGM + MAERSK FAR EAST - ECSA service

Wed Jun 12 10:48:13 CEST 2013 linervision

As was announced Mid-May, a group of six carriers consisting of Maersk, CMA CGM, Hamburg-Süd, CSAV, CSCL and Hanjin, have decided to cooperate in the Far East – ECSA lane and to replace three existing loops with three new services of somewhat lower capacity. Maersk Line and CMA CGM have revealed the details of the first of these loops (#2805). It will turn in 77 days as expected but two ships have yet to be nominated. Whereas a nomination for the second sailing from Busan on 10 July is highly likely, it seems that 15 August will actually see a blank sailing from Korea and that the loop will actually deploy 10 ships only. Full story: http://linervision.wordpress.com/2013/06/12/far-east-ecsa-service-revisions-set-to-materialise%e2%80%8f/

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data