General information

IMO:
MMSI:
370601000
Callsign:
3FBA8
Width:
4.0 m
Length:
24.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Panama
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
94.6° / -127.0
Heading:
7.0° / -127.0
Speed:
Max speed:
Status:
waiting
Area:
Ukraine
Last seen:
2024-04-03
25 days ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
193 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-03-10
2024-03-16
5d 19h 45m
2024-02-16
2024-03-10
22d 13h 46m
2023-09-12
2023-09-15
3d 6h 51m
2023-09-06
2023-09-07
1d 48m
2023-08-21
2023-08-22
23h 44m
2023-08-17
2023-08-21
3d 14h 13m
2023-08-13
2023-08-17
3d 22h 12m
2023-07-31
2023-08-07
7d 4h 18m
2023-07-22
2023-07-25
3d 11h 13m
2023-07-11
2023-07-11
4h 7m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Bosphorus Bridge 2
2023-12-20
Enter
Bosphorus Bridge 2
2023-08-22
Leave
Bosphorus Bridge 1
2023-08-22
Leave
Marmara Island
2023-07-05
Enter
Bosphorus Bridge 1
2023-07-04
Enter
Bosphorus Bridge 2
2023-07-04
Enter
Bosphorus Bridge 2
2023-06-28
Leave
Note: All times are in UTC

Latest news

Engine damage in Black Sea

Wed Feb 13 13:45:53 CET 2019 Timsen

The "Grand Light" suffered an engine failure in the Black Sea on Feb 9, 2019. The tug "Diamond D" has been appointed to tow the vessel to Diliskelesi, ETA Feb 13. During the Istanbul strait passage, a coastal safety tug provided escort service for the vessel and strait traffic safety. The ship berthed in Tavsancil, Gebze, at 8 a.m.

Tahsin released for repairs

Sun Dec 31 15:59:25 CET 2017 Timsen

After more than six months detained at Sharpness Dock over concerns including unpaid wages and a lack of drinking water, the "Tahsin" has been released. Detained by the Maritime and Coastguard Agency (MCA) in June 2017 due to 12 ‘deficiencies’ identified by inspectors, the "Tahsin" has been manned by three different crews during its time in Sharpness. The ship was given a conditional release on Dec 17 allowing it to return to Gemtis shipyard in Istanbul not carrying cargo to address its issues. Amongst the issues found by Cardiff-based inspectors was faulty ventilation, wages not being paid and missing charts. During the vessel’s detainment, the three crews which have been based on the ship over the six month period have been supported by the charity Apostleship of the Sea (AoS). Several times a week, AoS representatives have visited the ship bringing them baked goods, fresh produce and transport into Berkeley to use its facilities. The crew has also received regular visits from the International Transport Workers’ Federation (ITF). Some of the original crew had not been paid since September and October 2016 when the "Tahsin" was detained. There were many findings onboard including evidence of the crew drinking seawater as there was no potable water on the ship for over ten days, out of date food, non-operational galley equipment and a genuine concern over the labour practices. The master thought it was acceptable to pay the crew every three months and not keep wage accounts. On Dec 31, the "Tahsin" was headed to Tuzla, ETA Jan 5, 2018. 12 deficiencies (inoperative ventilation, an invalid employment agreement, damaged cargo and hatchways, incorrectly paid wages, expired lifesaving equipment and missing publications and charts) were found with eight deemed to be grounds for the ship’s detention. Report with photo: http://www.gazetteseries.co.uk/news/15798945.Turkish_cargo_ship_released_six_months_after_being_detained_at_Sharpness_dock/

Tahsin detained indefinitely for modern day slavery

Wed Aug 30 11:40:32 CEST 2017 Timsen

The "Tahsin" has been detained in Sharpness indefinitely after authorities found crew members living off sea water and out-of-date food. Described as having conditions close to ‘modern day slavery’, the ship has been prevented from sailing from Sharpness by the Maritime and Coastguard Agency. Maritime officials found failings with navigation equipment, invalid employment contracts, non-payment of wages, damage to cargo and expired licenses. They also found that there had been no potable water on the cargo ship for over ten days - and the crew had been living on sea water. The ship has been berthed at the docks on the river Severn near Berkeley, since May 31, 2017. It will not be going anywhere until its long list of problems is resolved. Report with photo: http://www.bristolpost.co.uk/news/bristol-news/ship-detained-port-near-bristol-397414

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data