General information

IMO:
MMSI:
574402044
Callsign:
Width:
14.0 m
Length:
78.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Vietnam
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Undefined
Course:
0.0° /
Heading:
0.0° /
Speed:
Max speed:
Status:
waiting
Area:
Vietnam
Last seen:
2024-04-16
13 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
15 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-04-12
17d 18h 30m
2024-04-10
2024-04-10
10h 40m
2024-04-08
2024-04-09
1d 58m
2024-04-07
2024-04-08
12h 55m
2024-04-06
2024-04-06
4h 8m
2024-04-06
2024-04-06
5h 41m
2024-04-03
2024-04-04
1d 6h 1m
2024-04-01
2024-04-01
9h 30m
2024-03-29
2024-04-01
2d 9h 13m
2024-03-25
2024-03-27
1d 13h 1m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Container ship got stuck under bridge

Mon Apr 15 10:23:54 CEST 2024 Timsen

On April 12, 2024, at 7.40 a.m. the' Phuoc Long 72', which was to dock at Binh Duong port, dragged anchor due to strong currents, broke lose from its mooring and drifted towards Dong Nai bridge at the border between Long Binh Tan ward, Bien Hoa city and Binh Thang ward, Di An city, Binh Duong province, where it got stuck. The Dong Nai Provincial Police pulled the ship out again at 8.15. a.m. The ship was towed back to Binh Duong port, while the authorities assessed the extent of damage to the bridge. No injuries were reported. Report with photos: https://danviet.vn/giai-cuu-tau-phuoc-long-72-cho-container-co-tai-trong-4600-tan-ket-duoi-cau-dong-nai-20240412122018274.htm

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data