General information

IMO:
7911545
MMSI:
316058938
Callsign:
5BRC5
Width:
28.0 m
Length:
166.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Canada
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
360.0° / 3.0
Heading:
511.0° / 3.0
Speed:
Max speed:
Status:
moving
Area:
Canada
Last seen:
2026-06-13
5 days ago
 
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
203 days ago 
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Former Stena ferry converted to floatel

Mon Oct 06 17:08:22 CEST 2025 Timsen

After on Aug10, 2025, the Bridgemans Services Group has begun the extensive refit of their floatel 'Saga', since renamed ' Saga X', the ship berthed in Singapore on Oct 4. . Destined for Canadian waters, the 'Saga X' will join Bridgemans’ current floatel 'Isabelle X' in Squamish, British Columbia, doubling the workforce capacity of workers building the world’s first net zero LNG export facility. After the refit, the ship offers newly renovated single cabins with private ensuites, a high-end dining room, comfortable lounges, meeting rooms, fast wi-fi, offices, first aid clinic, a state-of-the-art gym, café and a sports lounge with arcade games and pool tables. The floatel also offers a wide array of advanced environmental systems including an ultraviolet water purification system, the ability to run on shore hydro power, industrial-sized heat pumps, and sewage treatment that includes ultrafiltration and a low intensity UV unit for removing bacteria.

Idled ferry could become hospital ship

Wed Apr 08 10:44:41 CEST 2020 Timsen

Following the closure of the ferry route between Frederikshavn and Oslo, the Stena Line saw a new possible assignment for the 'Stena Saga'. Within a couple of weeks the ferry which was llaid up in Uddevalla on April 3 could be converted into a hospital ship with 520 places. On March 19, Stena Line announced that as a direct consequence of the corona virus, the service between Oslo and Frederikshavn, which had been served since 1994 was operated by the 'Stena Saga' would be closed. The tough situation forced the company to make the decision as the route was largely dependent on passenger traffic and the important high season in the summer. The company could simply not afford to wait and hope for the next summer. The subsidiary Stena Roro took over the vessel and was commissioned to find a new use for it. . Stena Roro already has extensive experience in building hospital vessels through the ongoing construction of the 'Global Mercy' for the organization Mercy Ships. They have developed a design in which within 2-3 weeks the ventilation system can be rebuilt, alarm systems and communication systems installed and also the interior to suit it can be constructed. The crew can be separated from patients and take other necessary measures. It was not intended for patients to receive intensive care on board, but rather the ship could relieve the hospitals with patients who do not need intensive care with some form of aftercare. However, Stena Roro has not yet received an order for such a ship.

Stena Saga laid up after closure of route Frederikshavn-Oslo

Thu Mar 19 18:41:33 CET 2020 Timsen

After more than 40 years, Stena Line now has permanently closed the route between Frederikshavn and Oslo. This was a consequence of the corona crisis and the prospect of losing the entire summer season this year. 30 Norwegian employees lose their jobs. The Frederikshavn-Oslo route depended almost entirely on passenger traffic and the important peak season in the summer. Stena said it could simply cannot afford to wait and hope for next summer. The 'Stena Saga' made its last trip from Frederikshavn to Oslo on March 14 and was laid up in Gothenburg on March 16 at 7 a.m.

Upload News

Ship master data