General information

IMO:
9682758
MMSI:
636016806
Callsign:
D5HX3
Width:
43.0 m
Length:
250.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Liberia
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
3.9° / 0.0
Heading:
4.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Coral Sea
Last seen:
2024-04-20
4 days ago
 
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 days ago 
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-04-18
2024-04-19
1d 2h 17m
2024-03-30
2024-04-01
2d 2h 50m
2024-02-15
2024-02-16
1d 16h 18m
2024-01-23
2024-01-30
7d 6h 16m
2024-01-15
2024-01-19
4d 5h 1m
2023-12-12
2023-12-13
1d 9h 28m
2023-11-17
2023-11-24
6d 1h 50m
2023-11-12
2023-11-16
4d 7h 9m
2023-08-26
2023-08-29
2d 11h 46m
2023-07-28
2023-08-05
8d 12m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Nagoya Bay
2023-05-25
Enter
Nagoya Bay
2023-05-21
Leave
Nagoya Bay
2022-12-29
Enter
Nagoya Bay
2022-12-25
Leave
Nagoya Bay
2022-11-04
Enter
Nagoya Bay
2022-10-31
Leave
Nagoya Bay
2022-08-09
Enter
Note: All times are in UTC

Latest news

MOL’s Newbuilding Coal Carrier Shin Yahagi Maru to Serve Chubu Electric Power

Fri Jan 23 08:26:22 CET 2015 arnekiel

Mitsui O.S.K. Lines, Ltd. yetsreday announced the delivery of the coal carrier Shin Yahagi Maru, which will serve Chubu Electric Power Co., Inc. (President: Akihisa Mizuno; headquarters: Nagoya, Aichi Prefecture), was delivered at Imari Shipyard and Works of Namura Shipbuilding Co., Ltd. (President: Kensuke Namura; headquarters: Nishi-ku, Osaka) on January 22, 2015. The vessel, which was jointly developed by Namura Shipbuilding and MOL, is a state-of-the-art coal carrier with a wide-beam/shallow-draft configuration and wide range of advanced safety and energy-saving features. The vessel is so-called “Hekinan MAX” which has characteristic 250 meters length to l maximize transport volume to the discharging port, Chubu Electric Power’s Hekinan Thermal Power Plant (Location: Hekinan, Aichi Prefecture). The new vessel succeeds the Yahagi Maru, a coal carrier that served Chubu Electric Power for 21 years starting in 1992. It will play a central role in supplying coal to the company’s thermal power plants under a new long-term consecutive voyage service contract.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data