General information

IMO:
MMSI:
244620946
Callsign:
PC5205
Width:
23.0 m
Length:
117.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Netherlands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
136.8° / 0.0
Heading:
159.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Rotterdam (Hartelhaven)
Area:
Netherlands
Last seen:
2024-04-30
3 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
8 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-04-29
1d 15h 39m
2024-04-27
2024-04-27
3h 18m
2024-04-25
2024-04-25
8h 43m
2024-04-23
2024-04-23
4h 47m
2024-04-21
2024-04-21
11h 27m
2024-04-19
2024-04-19
3h 3m
2024-04-17
2024-04-17
5h 3m
2024-04-15
2024-04-15
3h 33m
2024-04-13
2024-04-13
4h 55m
2024-04-11
2024-04-11
4h 6m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Hans Weert
2023-05-25
Enter
Terneuzen
2023-05-25
Leave
Vlissingen Port
2023-05-25
Enter
Vlissingen Port
2023-05-23
Leave
Note: All times are in UTC

Latest news

Barge in danger of sinking after grounding

Fri Nov 21 18:27:18 CET 2014 Timsen

Salvors of Multraship refloated the grounded push combination "Veerhaven IX" in the east port of Terneuzen in the night hours of Nov 21, 2014. The combination with two loaded and two empty barges was en route from Vlissingen to Gent when around 2:15 a.m., just after high tide, the combination ran aground. The tug "Multratug 19" was quickly on the spot and could pull the combination in deep water in spite of the falling water. The convoy was taken to the East Haven, where an inspection by divers was conducted and it was found that one of the barges which was loaded with coal was taking in water. The salvors immediately mobilized a diving team, pumps, sealing materials and the crane "Ovet 8" to avoid a sinking. The leak was temporarily patched, the barge unloaded into an empty one and the salvage Operation finished at 1.30 p.m. The damaged barge was taken to the shipyard De Schroef in Sluiskil for repairs.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data