General information

IMO:
9294226
MMSI:
224836000
Callsign:
ECLQ
Width:
26.0 m
Length:
97.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
High-Speed Craft
Ship type:
Flag:
Spain
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
54.7° / 0.0
Heading:
169.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Santa Cruz de la Palma (Santa Cruz de la Palma Port)
Area:
Spain
Last seen:
2026-07-13
< 1 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
5 min ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Ferry sidelined after water jet damage

Mon Mar 02 12:53:14 CET 2026 Timsen

The “Volcán de Tirajana” suffered a damage to the waterjet fender on Feb 27, 2027, at 8.30 p.m, while sailing in winds of 40 knots. The catamaran ferry spent the night moored in the port of San Sebastián de La Gomera, with about 20 passengers on board bound for La Palma, due to the impossibility of finding accommodation for them in the city, while awaiting the arrival of a repair team to fix the damage. On board, the passengers spent the night uncertain about the ship's possible departure. On Feb 28 the company arranged the transfer the ‘Bencomo Express' of Fred Olsen whichtook them back to the port of Los Cristianos, Tenerife, and after a brief stop, headed towards La Palma. The Armas Trasmediterránea Group had no replacement vessel available, as the catamaran “Volcán de Teno,” which usually serves the La Gomera route, has been out of service since mid-December. Zhe “Volcán de Teno” was limited in its maneuverability due to having only three engines. The limited maneuverability directly affectrf the safety of the ship and its crew and passengers. This esd compounded by the crew's lack of rest during the stop in La Palma, as operating with only three engines causes delays and, consequently, violations of labour regulations, all with the approval of the fleet manager and executives in Madrid.

Ferry suffered hydraulic failure

Fri May 09 22:26:24 CEST 2025 Timsen

A hydraulic failure caused a sdelay of three hours in the departure of the "Volcán de Tirajana" from the port of Santa Cruz de La Palma on the morning of May 9, 2025. The vessel departed at 9:12 a.m. and arrived at the port of Los Cristianos at 12:30 p.m., although it had to wait for the departure of the "Volcán de Teno" to La Gomera. During the stopover in the port of Los Cristianos, technicians were on board to resolve the problem, after attempts to resolve it the previous night during the stopover in Santa Cruz de La Palma were unsuccessful. The domino effect led to a subsequent delay in the connection with El Hierro, on one of the busiest days at the start of the weekend. The vessel departed Los Cristianos at 1:10 p.m. and arrived in La Estaca at 4:10 p.m., meaning the trip took three hours.

Upload News

Ship master data