General information

IMO:
9752656
MMSI:
477810700
Callsign:
VROM2
Width:
43.0 m
Length:
217.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Hong Kong
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
313.9° / 0.0
Heading:
46.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Jebel Ali (Jebel Ali Port)
Area:
United Arab Emirates
Last seen:
2024-04-26
19 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
18 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-04-19
2024-04-24
4d 14h 8m
2024-02-26
2024-03-27
30d 14m
2024-01-14
2024-01-17
3d 6h 22m
2023-07-25
2023-07-25
4h 1m
2023-04-08
2023-04-14
6d 7h 10m
2023-03-09
2023-03-11
2d 1h 24m
2022-12-03
2023-01-10
37d 20h 10m
2022-11-07
2022-11-12
4d 9h 18m
2022-08-08
2022-09-14
37d 4h 54m
2022-07-24
2022-07-26
2d 4h 8m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Strait of Hormuz
2024-04-18
Enter
Malacca Straits - North
2024-04-08
Leave
Malacca Straits - Penang Island
2024-04-04
Enter
Malacca Straits - Port Klang
2024-04-04
Enter
Kukup Island
2024-04-03
Enter
Hong Kong Approach
2024-03-29
Enter
Hong Kong Approach
2024-03-29
Leave
Note: All times are in UTC

Latest news

18,000-Tonne BorWin Gamma Platform Installed in North Sea

Wed Oct 17 11:28:54 CEST 2018 arnekiel

The 18,000 tonne topside of the BorWin gamma High Voltage Direct Current (HVDC) platform has been installed on its jacket foundation in the German sector of the North Sea, where will soon be used to supply green power to more than one million German households. The giant converter arrived on board the heavy lift vessel Xiang He Kou which was used in the float-over installation of the platform at the installation site a little over 80 miles off the coast of Germany. The heavy lift vessel Xiang He Kou arrived on site earlier this month after completing its voyage from Drydocks World’s Dubai Shipyard, where construction of the BorWin gamma has been underway since 2014. Video: https://youtu.be/HoxGV0hS_00

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data