On MAy 15, 2024, at noon , the Port Authority of Paleochora was informed that during the mooring manoever of the 'Samaria I', there was an impact on the pier of Skala Paleochora, Chania, due to a sudden gust of wind and high waves. The ferry suffered a breach approximately ten centimeters in diameter and approximately fifty centimeters long in the bow bulkhead approximately half a meterabove the waterline. The ship safely disembarked the passengers and vehicles, and no injuries were reported and no marine pollution was observed. The Paleochora Port Station, which conducted the preliminary investigation, banned the ship from sailing until a certificate of seaworthiness has been presented by themonitoring classification society.
News
Whittier
U.S. Coast Guard crews have given up the search for a 49-year-old Cordova man who went missing after an explosion and subsequent fire on a fixed barge at Delong Dock in Whittier, Alaska, shortly after midnight on Monday. The fire spread to the pier and then to the Anagalik, a 99-foot commercial fishing vessel that was initially reported to have two people aboard at the time of the explosion. Whittier Police Department personnel have since confirmed one of those two is safely aboard a different vessel en route to Whittier. The fire has now been extinguished, but the fishing vessel and barge sank in 85 feet of water at the pier with a potential maximum of 5,500 gallons of fuel oil aboard. The fishing vessel owners have contracted Global Diving and Salvage for clean-up and salvage efforts. An MH-60 Jayhawk helicopter crew from Coast Guard Air Station Kodiak has searched for the missing person by air, and crews aboard the Coast Guard Cutter Chandeleur and Coast Guard Auxiliary 336 searched nearby waters.
Halsa
With a NOK 1.23 billion offer, Fjord1 won the concession to run the E39 Halsa-Kanestraum route, the latest major ferry connection awarded by the Norwegian Road Authority.
MISS SALLY DANE
On May 15, 2024, the 'Miss Sally Dane' was deployed to remove the oil barge 'MMLP 321', carrying 30,000 barrels of vacuum gas oil, which had broken lose from a tug and allided with the Pelican Island Causeway, causing it to partially collapse, at 9.48 a.m. The U.S. Coast Guard coordinated the response along with local, state, and federal agencies. Watchstanders issued an urgent marine information broadcast and coordinated the launch of a Coast Guard Station Galveston boat crew to respond. 3,000 feet of containment boom were deployed in the vicinity of the allision. The intercoastal waterway has been closed from Pelican Cut (mile marker 351.5) to the Galveston Causeway (mile marker 357.3) and a 5.8-mile safety zone has been issued for the surrounding waters. Mariners were urged to avoid the area. No injuries have been reported. The barge had slammed into a bridge pillar, spilling oil into surrounding waters and closing the only road to Pelican Island, that is home to a university. One person on the barge was knocked into the water and quickly rescued. The barge had gone adrift from a tug which was backing out of the Texas International Terminals, a fuel storage operator next to the bridge, after losing control of two barges it was pushing. The current was very bad, and the tide was high. Fire trucks drove over the bridge as workers and law enforcement officials looked at the remnants of the collapsed rail line. A large piece of broken concrete and debris from the railroad was hanging off the side of the bridge and laying on the barge. The rail line only serves as protection for the structure and has never been used. Engineers from the Texas Department of Transportation were en route to inspect the roadway and determine if there was damage. The bridge remained closed until it is deemed safe to use. Involved with the response were: - U.S. Coast Guard Sector Houston-Galveston; - U.S. Coast Guard Marine Safety Unit Texas City; - U.S. Coast Guard Air Station Houston; - U.S. Coast Guard Station Galveston; - U.S. Army Corps of Engineers; - Texas Department of Transportation; - Texas Commission on Environmental Quality; - Texas Parks and Wildlife; - Texas General Land Office; - Texas A&M; - Galveston County Office of Emergency Management; - Galveston County Police Department; - Galveston Fire Department. Reports with photos: https://www.news.uscg.mil/Press-Releases/Article/3776804/coast-guard-partner-agencies-responding-to-pelican-island-causeway-allision-in/ https://www.nbcdfw.com/news/local/texas-news/barge-hit-bridge-galveston-texas-oil-spill/3541844/
BORKUM
The 'Borkum', that will dock in Cartagena in the next few hours and that according to the Solidarity Network Against the Occupation of Palestine (Rescop) is carrying weapons to Israel is actually destined for Slovenia, according to the information handled by the President of the Government of Murcia, Fernando López Miras. He has asked that his statements be understood “with caution” because it is not a matter for the Community of Murcia. "but an exclusive competence of Ports (of the State) and the Government of Spain." López Miras has explained that as far as he knows the vesseö S destination is Slovenia and, therefore, Israel is not the disembarkation point. He has also clarified that the port of Cartagena also does not have the necessary facilities to unload the material and containers transported by the vessel, although he has referred to the official information that State Ports can offer. Rescop alerted on May 14, 2024 of the arrival on May 16 of the ship at the port of Cartagena, where it would make a stopover, since its destination would be the port of Ashdod. According to this organization, the ship contains 20 tons of rocket motors, 12.5 tons of rockets with explosive charge, 1,500 kg of explosive substances and 740 kg of cannon propellant charges, although the Navy has neither confirmed nor denied its arrival at the port of Cartagena.
Rizhao
Shandong Landbridge Group has entered into an agreement with Beijing Energy Group to jointly develop a LNG receiving terminal at Landbrige Port in Rizhao. Under the agreement, the two parties will invest RMB6.7bn ($973m) in total for the construction of the terminal, which will have a designed handling capacity of 5m tons of LNG annually. Additionally, the two companies plan to join their efforts to develop overseas energy projects.
Gothenburg
APM Terminals Gothenburg has managed to cut quay crane waiting times by as much as 90% by implementing new standard operational procedures for container lashing. This translates to a reduction from 38 minutes to just four. Using ‘Lean’ methodology, which is being adopted across all of the company’s terminals around the world, a Transformation Team at APM Terminals Gothenburg identified the root cause of the time delay – inaccurate information provided to the vessel crew.
Sydney
DP World Australia has called for an end to the strikes at its ports this week, warning that the industrial action comes at a time when shipping lines are reviewing stevedore contracts. “The industrial action will cause significant disruption to DPWA customers and importantly the broader supply chain of shippers, exporters and importers. DPWA employees will also be unnecessarily and avoidably impacted by these lost earnings,” said Andrew Adam, chief operating officer at DPWA. DP World’s Brisbane, Sydney and Fremantle container terminals are on a rolling 48-hour strike, while workers at the company’s Melbourne operations have decided to down tools for 96 hours. The workers said in a release their actions this week are in order to fight against automation, outsourcing, cuts to income protection insurance, and “dishonest bargaining” by the company During the recent 12-week bargaining period, DP World said the local union did not make any material concessions to its initial 50 claims. These claims include a wage increase well above CPI, DP World said.
Rijeka
After many creditors withdrew distraint proceedings, the Commercial Court in Rijeka decided on Thursday to postpone the bankruptcy of Croatia’s debt-ridden shipyard “3. Maj” until Aug. 1. Seven days ago the shipyard’s account was blocked for 156 million kuna (23.8 million U.S. dollars). After some of the creditors pulled back, the blockade now amounts to 86 million kuna (13.1 million U.S. dollars). Judge of the Commercial Court in Rijeka Ljiljana Ugrin urged Croatian Electricity Industry and the Croatian government to engage in the process of revocation of the enforcement order, so that “3. Maj” could continue with unfinished shipbuilding contracts.