The 'Dali' had electrical problems the day before it left the Port of Baltimore when it was docked, according to a preliminary report released on May 14 by investigators at the National Transportation Safety Board. The 'Dali' experienced a blackout during in-port maintenance on March 25, the NTSB wrote in its report, when a crew member mistakenly closed an inline engine exhaust damper. The NTSB says it's still not clear how that incident relates to what happened early the following morning, when the 'Dali' lost power twice in the minutes before it crashed into one of the bridge's supports. The NTSB is still investigating the electrical configuration following the first in-port blackout and potential impacts on the events during the accident voyage. Investigators at the NTSB have analyzed samples of the fuel that was being burned at the time of the accident, as well as other fuel tanks on the vessel. But those results did not identify any concerns relating to the quality of the fuel. The NTSB is working with the Maryland Transportation Authority to assess its other bridges and to determine whether pier protection measures need to be improved. The MDTA is studying options for upgrades to the existing protection system around both spans of the Bay Bridge that connect Annapolis to the Eastern Shore of Maryland. The NTSB investigation of all aspects of the accident is ongoing. Link to the report: https://www.ntsb.gov/investigations/Documents/DCA24MM031_PreliminaryReport%203.pdf
News
SKY PRINCESS
On May 14, 2024, a passenger of the 'Sky Princess', en route from Marseille to Gibraltar, needed to be medevaced 44 kilometers southeast of Alicante. The man had to be disembarked due to a heart attack. The CCS Valencia of Salvamento Marítimo mobilized the SAR helicopter Helimer 203, which hoisted the patient and took him and his wife to the Alicante airport.
Marseille
On 27 June the Corsican Parliament officially approved the upcoming 15-month public ferry service between Marseille and the island, starting on 1 October 2019.
COMMANDANT CHARCOT
the helicopter team of the Icelandic Coast Guard received a call of the ''Commandant Charcot' on the early morning of May 14, 2024, due to the acute illness of a passenger of the cruise ship, which was located on the east coast of Greenland. The crew of the TF-EIR helicopter flew a long distance from Reykjavík and about 130 nautical miles north of Horn. The man was hoisted on board in good condition and flown to Ísafjörður to refuel. From there, the helicopter flew straight to Reykjavik, and the patient was transported to the National Hospital. Report with video: https://icelandmonitor.mbl.is/news/news/2024/05/14/video_picked_up_a_sick_passenger_from_a_cruise_ship/
ABDULLAH
After the 'Abdullah has finally arrived in Kutubdia on May 13 at 6.40 p.m., the 23 sailors on board have returned to their relatives. On May 14, a lighter ship was brought to the KSRM Lighter Jetty Sadarghat. From here they returned to their respective homes. They have already spoken to their relatives who came to the jetty with flowers to welcome the sailors. Report with photo: https://www.rtvonline.com/english/bangladesh/14396
Port Hedland
Thirty-eight vessels at anchor off Port Hedland, waiting to load iron ore.
Agaete
In a ruling last week, the Court of Justice of the EU rejected an appeal presented by Fred. Olsen S.A. over a sentence dictated by the General Courts of the EU in March 2018, whereby the continued exclusive use of the Port of Agaete on the Island of Gran Canary, by Fred. Olsen, constituted a subsidy by the Government of the Canary Islands to said shipping line.
SALVAMAR LYRA
The CROSS La Garde reported the French yacht 'Arvi' with rudder problems in the Gulf of Roses. The CCS Barcelona mobilized the 'Salvamar Lyra', which took the ship in tow and safely pulled it to Roses at low speed due to the weather conditions and the rudder problem.
Cancun
Two identical 37-metre, 459-passenger catamarans have been completed by Wight Shipyard Co (WSC). The Incat Crowther-designed vessels will be transported to Cancun, Mexico, for Ultramar early next month.
Rotterdam
The first paperless, instantly financed and fully door-to-door tracked container made its way from Korea to the warehouse of Samsung SDS in Tilburg via Port of Rotterdam on blockchain-based platform DELIVER. ABN AMRO, Port of Rotterdam and Samsung SDS demonstrated that blockchain technology enables interoperability, and that integrated container tracking and tracing, required cargo documentation processing and financing can all be done in a trusted, secure and paperless way.