General information

Name:
Eastham
Country:
United Kingdom
UN/Locode:
GBEAM
Local time:
Vessels in Port:
8
Expected Vessels:
0
Berths:
1
Coordinates:
S 02° 57' E 053° 19'

Vessels in port

Name
Type
Arrived
Tanker
23.10. 01:46
Tanker
23.10. 01:13
Tanker
23.10. 00:58
Cargo Ship
22.10. 22:06
Unclassified
22.10. 20:59
Tanker
22.10. 11:05
Tanker
22.10. 09:53
Tanker
21.10. 23:51
Tanker
21.10. 21:02
Unclassified
21.10. 11:53

Expected Vessels

Name
Type
Expected

Sailed Vessels

Name
Type
Sailed
Tanker
23.10. 02:26
Tanker
23.10. 01:22
Tanker
23.10. 00:12
Cargo Ship
22.10. 22:21
Unclassified
22.10. 21:22
Tanker
22.10. 11:37
Tanker
22.10. 10:11
Tanker
21.10. 21:22
Unclassified
21.10. 12:14
Tanker
21.10. 11:46

Latest news

Hydrodec to build UK's first oil re-refinery

Mon Aug 03 08:49:48 CEST 2015 arnekiel

Peel Ports Group on 31 July announced a deal worth GBP40 million (USD62.4 million) with the Hydrodec Group that will see the UK's first purpose-built oil re-refinery constructed on a nine-acre site at Port Wirral in Eastham. Hydrodec, which operates two other used oil re-refineries, in Ohio, US, and in New South Wales, Australia, expects to begin construction in 2016 and have the facility on stream in 18 months. It picked Port Wirral - which is being redeveloped - because of excellent transport connections by road, rail, and water, the latter via the River Mersey and Manchester Ship Canal. http://www.ihsmaritime360.com/article/18841/hydrodec-to-build-uk-s-first-oil-re-refinery

Upload News