General information

IMO:
1008956
MMSI:
319147700
Callsign:
ZGIA4
Width:
8.0 m
Length:
43.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Pleasure Craft
Ship type:
Flag:
Cayman Islands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
174.9° / 6.0
Heading:
145.0° / 6.0
Speed:
Max speed:
Status:
moored
Area:
Mexico
Last seen:
2024-05-05
1 day ago
 
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 days ago 
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-03-11
2024-03-11
3h 1m
2024-03-11
2024-03-11
25m
2024-03-07
2024-03-11
3d 11h 5m
2024-02-28
2024-03-02
3d 1h 54m
2024-02-08
2024-02-10
2d 6h 41m
2024-01-28
2024-02-01
3d 22h 30m
2024-01-11
2024-01-15
3d 23h 12m
2023-10-06
2024-01-11
96d 21h 56m
2023-09-29
2023-10-06
7d 2h 40m
2023-09-11
2023-09-14
2d 19h 9m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Balboa Approach
2024-03-11
Enter
Puente de las Americas
2024-03-11
Enter
Miraflores Locks
2024-03-11
Enter
Pedro Miguel Locks
2024-03-11
Enter
Gatun Locks
2024-03-11
Enter
Colon Approach
2024-03-10
Enter
Strait of Gibraltar
2023-09-08
Enter
Note: All times are in UTC

Latest news

Yacht struck operations booth

Fri Jan 13 10:29:05 CET 2023 Timsen

During the bridge opening at the Simpson Bay Lagoon, St. Maarten, for incoming maritime traffic on Jan 8, 2023, at 5 pm. the 'Baca' struck the Simpson Bay Lagoon Authority (SLAC) operations booth and caused severe structural damage. Wires leading to the operations consoles were also damaged. There were no injuries to the bridge operator. PSG personnel conducted a preliminary assessment, and the bridge remained in operation for maritime traffic and continued as normal for the remainder of the day. However, the Simpson Bay Bridge was to be temporarily closed for maritime, motorized, and pedestrian on Jan 12 at 4 a.m. in connection with the removal of the damaged operations control booth. Heavy equipment will be in operation in the area at the time. 

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data