General information

IMO:
8127309
MMSI:
Callsign:
3FDA4
Width:
17.0 m
Length:
108.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Panama
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Anchored
Course:
0.0° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moored
Location:
Tuzla (Tuzla Port)
Area:
Turkey
Last seen:
2017-04-25
2529 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
2529 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2017-04-25
2017-04-26
12h 14m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Cracked wreck to be demolished

Wed May 29 11:09:03 CEST 2019 Timsen

The removal of the "Berkan B" sunk in Piomboni will cost € 36.000. The work will be carried out by Techno Srl which was contracted by the port authority. In a meeting on April 2 held in the prefecture in which the captaincy, the municipality, the Port Authority, Arpae and Ausl took part, the need and urgency of the demolition was revealed. The ship, which had been moored for years because it was seized, had broken in two during the dismantling operations after it had been purchased. The danger to navigation forced the institutions to act quickly to secure the wreck. Italian report with photos: https://www.ravennaedintorni.it/economia/2019/05/28/relitto-berkan-b-appaltati-lavori-la-demolizione-della-nave-nel-piomboni/

Half demolished wreck threatening environment

Wed Feb 13 12:12:33 CET 2019 Timsen

The "Berkan B", which was abandoned in Pialassa, was feared to create an environmental disaster in the northern area of ​​the Pialassa dei Piomboni. The ship was languishing at a quay since October 2017, when it broke in two during demolition work which did not take into account the phases of lightening. The work continued for a few months, then the wreck was abandoned, and water was entering the stern, which together with the bow sinks deeper every with the mooring lines being at maximum tension. Very soon the whole wreck and its polluting load could sink and the pollutants spread up to the Pialassa Baiona. On Feb 11, 2019, a complaint was filed with the provincial command of the Carabinieri of Ravenna, for an imminent environmental disaster. The complaint was forwarded to the Ministry of Infrastructure and Transport and the Ministry of the Environment. Italian report with photos: https://citynews-ravennatoday.stgy.ovh/~media/original-hi/60071855465702/2019_02_10_berkan8_ph-cristiano-mazzoli-2.jpg

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data