GOLDY SEVEN
Course/Position
Latest ports
Latest Waypoints
Latest news
Refusal of access to Paris MOU ports after detention
On May 26, 2025, the 'Goldy Seven' Goldy Seven' was detained in Southampton, UK with 20 deficienciev, four of which being regarded as seriously and grounds for a detention: 1) Fire safety - Evaluation of crew performance Lack of training 2) Labour conditions - Sanitary facilities Not as required 3) Radio communications - Reservce source of energy Not as required 4) Pollution Prevention - Garbage shipboard handling Not as required The vessel was released again on June 10 and left the port en route to Tangier with an ETA as of June 15. The inspection led to a refusal of access to Paris MOU ports. https://www.facebook.com/profile.php?id=100063576908591
Flettner ship started trials
After a Flettner rotor was fixed on the "Fehn Pollux", the ship left the port of Leer for trials on June 26, 2018. Video: https://www.youtube.com/watch?v=Sp4kz023wF8
"Fehn Pollux“ to be the frst ship equipped with a Flettner Rotor developed in Leer
“Fehn Pollux” today welcomed scientists from the University Emden-Leer aboard. “Fehn Pollux“ will be the frst ship equipped with a Flettner Rotor developed in Leer. After extensive checks on land it shall now be tested in its future environment. Because there is no experience with this type of rotor aboard a merchant vessel, extensive pre-calculations and planning are necessary which include today’s visit aboard. The “Eco Flettner WHC” is an 18 meter high rotating cylinder which has a diameter of three meters. http://www.hellenicshippingnews.com/experts-visit-fehn-pollux/
Upload News