General information

IMO:
9454125
MMSI:
352980836
Callsign:
3E3563
Width:
17.0 m
Length:
113.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Panama
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
170.0° / 0.0
Heading:
104.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Area:
Turkey
Last seen:
2023-05-28
5 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
9 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2023-05-22
6d 2h 4m
2023-05-19
2023-05-21
1d 18h 42m
2023-05-11
2023-05-11
3h 57m
2023-04-03
2023-04-03
1h 45m
2023-03-31
2023-03-31
15h 31m
2023-03-29
2023-03-30
1d 5h 54m
2023-03-23
2023-03-24
13h 2m
2023-03-02
2023-03-03
17h 28m
2023-02-27
2023-03-02
2d 10h 7m
2023-02-27
2023-02-27
15m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Bosphorus Bridge 1
2023-05-11
Enter
Bosphorus Bridge 2
2023-05-11
Enter
Bosphorus Bridge 2
2023-04-03
Leave
Bosphorus Bridge 1
2023-04-03
Leave
Bosphorus Bridge 1
2023-03-23
Enter
Bosphorus Bridge 2
2023-03-23
Enter
Bosphorus Bridge 2
2023-03-04
Leave
Note: All times are in UTC

Latest news

Repairs in Tuzla completed

Thu Feb 03 09:55:39 CET 2022 Timsen

Repairs of the 'Matrix' have been completed in a Tuzla shipyard. The vessel shifted to the anchorage, where sea trials were carried out under the supervision of a class surveyor and the owner's technical superintendent with a satisfactory result. A new set of trading certificates was issued by the classification society and flag state authority. The vessel remaine stationary at the anchorage as of Feb 3.

Repairs in Tuzla underway

Mon Jan 10 10:34:46 CET 2022 Timsen

The 'Matrix', which had suffered an engine failure in pos. 42 23 00 N, 034 58 30 E on Nov 22, 2021,and was towed to Tekirdag on Nov, 29, got new spare parts for repairs provided by the owners, while repairs were underway in a Tuzla repair yard, as of Jan 8, 2022. Sea trials were to be carried out at Tuzla anchorage upon completion of permanent repairs.

Disabled ship towed to Tuzla

Sun Dec 05 16:11:02 CET 2021 Timsen

After repair attempts of the crew of the 'Matrix' at Tekirdag failed, the tug 'Haktan 1' re-attended at Tekirdag in order to tow the vessel to the Tuzla shipyard area. The towage operation commenced on Dec 3 at 2 a.m. The ship entered the shipyard in the evening, upon completion of custom formalities.A Class surveyor together with the owners' superintendent and shipyard duty engineers carried out a detailed damage survey. Shore-based technical teams will commence the repairs as per the class surveyor's technical recommendations.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data