General information

IMO:
9385673
MMSI:
257356000
Callsign:
LADV7
Width:
44.0 m
Length:
283.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Norway
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
301.6° / 0.0
Heading:
296.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Strait of Malacca
Last seen:
2022-10-02
3 days ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2022-08-06
2022-09-10
34d 22h 44m
2022-08-01
2022-08-06
5d
2022-07-07
2022-07-08
1d 4h 29m
2022-06-17
2022-06-17
18m
2022-05-05
2022-05-06
1d 1h 27m
2022-05-02
2022-05-03
23h 29m
2022-04-30
2022-04-30
13h 49m
2021-12-22
2021-12-23
23h 6m
2021-12-04
2021-12-05
22h 25m
2021-11-18
2021-12-02
14d 14h 12m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Kukup Island
2022-10-01
Enter
Kukup Island
2022-06-29
Leave
Malacca Straits - Penang Island
2022-06-29
Leave
Malacca Straits - Port Klang
2022-06-29
Leave
Malacca Straits - North
2022-06-28
Enter
Banda Aceh
2022-06-28
Leave
Jeddah South
2022-06-20
Enter
Note: All times are in UTC

Latest news

Engie opens First Floating LNG Import Terminal in Turkey

Thu Dec 29 08:04:44 CET 2016 arnekiel

ENGIE has been selected by project developers Kolin and Kalyon to deliver this fast-track Floating Storage and Regasification Unit (FSRU) based solution. The Group committed the Neptune, one of the two FSRU of its fleet, to the project. The 145,000 m3 capacity vessel will act as an LNG receiving and storage facility and will deliver natural gas in gaseous form. The overall infrastructure developed by Kolin and Kalyon includes a jetty and an onshore gas pipeline to connect the terminal to the national gas transport grid, operated by BOTAS. From final investment decision to completion, record breaking terminal project development took only 6.5 months. The Neptune vessel arrived at ETKI LNG terminal berth on December 11th fully loaded with LNG and proceeded immediately with commissioning operations.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data