General information

IMO:
9750660
MMSI:
477327300
Callsign:
VRRY3
Width:
50.0 m
Length:
299.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Hong Kong
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
63.3° / -5.0
Heading:
61.0° / -5.0
Speed:
Max speed:
Status:
moving
Area:
Barents Sea
Last seen:
2020-02-27
1 day ago
 
Source:
T-AIS
Destination:
ETA:
Max Draught:
Last drought:
Last update:
1 day ago 
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2020-02-23
2020-02-24
1d 12m
2020-02-04
2020-02-05
1d 24m
2020-01-16
2020-01-17
1d 3h 31m
2019-12-31
2020-01-01
1d 47m
2019-12-11
2019-12-12
1d 12m
2019-11-23
2019-11-24
1d 2h 29m
2019-11-04
2019-11-05
1d 2h 7m
2019-10-16
2019-10-17
1d 33m
2019-09-20
2019-09-22
1d 22h 45m
2019-06-26
2019-07-26
30d 8h 44m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Hook of Holland
2020-02-24
Leave
Hook of Holland
2020-02-22
Enter
Margate
2020-02-05
Leave
Margate
2020-02-04
Enter
Hook of Holland
2020-01-17
Leave
Hook of Holland
2020-01-16
Enter
Margate
2020-01-01
Leave
Note: All times are in UTC

Latest news

MOL Names 3rd Yamal LNG Carrier

Sun Jul 21 13:31:54 CEST 2019 arnekiel

Japanese logistics major Mitsui O.S.K. Lines (MOL) announced that a naming ceremony for an ice-breaking LNG carrier, jointly ordered by MOL and China COSCO Shipping Corporation Limited (China COSCO Shipping), was held at Daewoo Shipbuilding & Marine Engineering Co., Ltd. (DSME). The newbuilding has been named Nikolay Urvantsev, in honor of the famous Russian Arctic explorer and geologist. A crowd of VIPs, including personnel from PAO Novatek, the main shareholder of the Yamal LNG project participated in the ceremony. A press release from MOL said that the "Nikolay Urvantsev" is the sister vessel of the "Vladimir Rusanov" and "Vladimir Vize", which started transport service in 2018 under a long-term charter contract to transport LNG for the YAMAL LNG Project.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data