General information

IMO:
9668362
MMSI:
356836000
Callsign:
3EWV5
Width:
27.0 m
Length:
169.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Panama
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
207.4° / 0.0
Heading:
210.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
South China Sea
Last seen:
2024-03-25
3 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-03-18
2024-03-22
3d 23h 12m
2024-02-22
2024-02-25
3d 7h 3m
2024-02-18
2024-02-21
2d 6h 58m
2024-02-14
2024-02-16
2d 6h 30m
2024-02-04
2024-02-06
1d 21h 25m
2024-01-16
2024-01-19
3d 2h 49m
2024-01-14
2024-01-15
18h 44m
2024-01-12
2024-01-14
1d 19h 22m
2024-01-01
2024-01-04
2d 2h 50m
2023-12-22
2023-12-25
3d 28m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Kukup Island
2023-08-05
Leave
Malacca Straits - Port Klang
2023-08-05
Leave
Malacca Straits - Penang Island
2023-08-04
Leave
Malacca Straits - Penang Island
2023-07-17
Enter
Malacca Straits - Port Klang
2023-07-16
Enter
Kukup Island
2023-07-16
Enter
Kukup Island
2022-09-07
Leave
Note: All times are in UTC

Latest news

Master sentenced guilty in cutting cable

Wed Apr 06 10:30:46 CEST 2016 Timsen

A court in the city of Annaba on Apr 5, 2016, found the master of the "Poavosa Ace" guilty in cutting a fiber optic cable linking Annaba to Marseille in Oct 2015, and sentenced him to six months in prison, plus 406 Euros fine. He was found guilty in violation of navigational regulations and destruction of property of strategic importance.

Date for court hearing regarding cut submarine cable set

Wed Dec 02 10:36:54 CET 2015 Timsen

Captain Du Chang Long. the master of the "Poavosa Ace" which was identified by the inquest as responsible for cutting the submarine cable SMWE4 off Sidi Salem was linking Annaba and Marseilles, on Oct 22, 2015, will be heard on Dec 17 at the court in Annaba. Algeria Telecom pointed out that the hearing followed a petition submitted on Nov 26 Nov requesting confirmation of the seizure of the "Poavosa Ace" due to lost profits, repair costs and damage suffered by Algeria Telecom for the duration of the cut cable that deprived the company 80% of its international bandwidth capacity, which caused serious disturbances on the national broadband network for six days. An arrest request was posed by Algeria Telecom on Nov 16. Pending the final ruling by the court of Annaba, the captain remains under judicial supervision with a prohibition to leave the country.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data