General information

IMO:
8402591
MMSI:
201100134
Callsign:
ZADM5
Width:
11.0 m
Length:
79.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Albania
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
94.5° / 0.0
Heading:
92.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Mediterranean Sea
Last seen:
2024-04-26
11 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
5 hours ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-02-10
2024-02-11
1d 8h 6m
2024-01-15
2024-01-16
1d 4h 41m
2024-01-12
2024-01-14
1d 6h 52m
2023-12-03
2023-12-05
2d 5h 35m
2023-11-27
2023-11-28
6h 41m
2023-11-13
2023-11-14
10h 38m
2023-11-08
2023-11-10
2d 5h 16m
2023-10-10
2023-10-12
1d 21h 36m
2023-09-17
2023-09-20
2d 19h 5m
2023-08-18
2023-08-23
5d 1h 44m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Marmara Island
2023-11-12
Enter
Marmara Island
2023-10-13
Enter
Marmara Island
2023-08-24
Enter
Marmara Island
2023-07-29
Leave
Marmara Island
2023-06-22
Enter
Marmara Island
2023-06-02
Enter
Marmara Island
2023-05-30
Leave
Note: All times are in UTC

Latest news

Grounding off Lefkada

Fri Nov 16 10:39:15 CET 2018 Timsen

The "Koravi" ran aground near Akrotiri Dhaka at the southern coast of Lefkada in the Akrotiri sea with eight Albanian crew members on board in the night of Nov 15, 2018. The ship which was carrying 1,949 tons of iron rods and was enroute from Amaliapolis Volos to Albania, suffered water ingress. Two patrol boats of the Greek Coastguard and a helicopter were deployed to the site, and all crew members were taken off and transferred for preventive purposes to the Vasiliki Health Center in Lefkada. Seven of them were released soon after. On scene were southeast winds of five Beaufort. The ship was pulled free later in the day by the tug "Christos XXXIV" and towed to the port of Vassiliki, Lefkada. The water ingress in the bow did not affect the stability of the ship. The Lefkada Port Authority detained the vessel. It arrived in Sarande port on Dec 13 where the cargo was discharged. On Dec 22 it berthed in Durres at the ex-shipyard port basin area where it will undergo repairs. Greek report with photos and video: http://www.kolivas.de/archives/328036 https://www.youtube.com/watch?v=eWRFMWFRDRs

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data