General information

IMO:
8817370
MMSI:
305184000
Callsign:
V2PS2
Width:
12.0 m
Length:
82.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Antigua and Barbuda
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
273.1° / -10.0
Heading:
311.0° / -10.0
Speed:
Max speed:
Status:
moored
Location:
Area:
Estonia
Last seen:
2024-03-19
6 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
13 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-03-18
16h 23m
2024-03-12
2024-03-14
2d 3h 37m
2024-03-07
2024-03-09
2d 1h 23m
2024-03-06
2024-03-07
11h 29m
2024-03-04
2024-03-04
26m
2024-03-04
2024-03-04
1h 15m
2024-02-23
2024-02-23
58m
2024-02-22
2024-02-22
1h 4m
2024-02-17
2024-02-21
3d 23h
2024-02-16
2024-02-16
29m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Bornholmsgat
2024-03-15
Leave
Oresund Bridge
2024-03-15
Enter
Landskrona
2024-03-15
Enter
Helsingborg
2024-03-15
Enter
Anholt
2024-03-12
Enter
Läsö DK
2024-03-12
Enter
Skagen
2024-03-12
Enter
Note: All times are in UTC

Latest news

Disabled cargo ship towed to Rotterdam

Tue Mar 19 09:26:45 CET 2019 Timsen

The "Roseburg", after having sailed from Riga on March 5, 2019, bound to Shoreham fully loaded with a cargo of timber including deck cargo encountered serious engine problems which could not be repaired at sea In the late afternoon of March 10 a contract was signed between Landfall Marine Contractors and the owners of thevessel to tow the ship towards Rotterdam. The Dutch AHTS "Isa" (IMO: 9688879), which was standby at the shipyard in Giessendam for maintenance, was immediately mobilized and headed to the casualty. All proper sea-fastenings were done on the "Isa" whilst sailing towards Hoek van Holland as there was NW wind of 40-45 kn and gusting 50-55 kn. Also gear was readied to connect to the "Roseburg" on deck as fast as possible and the crew of the "Isa" did not have to stay longer on deck in these harsh weather conditions longer than necessary, when connecting to the casualty. Waves had an average of 5 to 6 meters Twhen heading to the casualtie's position 45 miles NW of Hoek van Holland. On MArch 11 at daybreak the tug arrived at the location went on standby and closely monitored the situation. The weather and sea state were still to rough for the upcoming hours. The forecasts were showing light decreasing winds during the next few hours. At mid-afternoon there was a time window to make the first attempt on connecting to the "Roseburg", which, however, failed due to the stormy conditions. Immediately a second attempt was made, which was successful. After the towing connection was fixed, the "Roseburg" started lifting her anchor. 30 minutes later the convoy was underway towards Rotterdam. On March 12 at 06:30 a.m. the "Roseburg" was sefely berthed at the Keppel Verolme Shipyard. She sailed again after completion of repairs on March 23 at 2.30 a.m. The vessel finally arrived in Shoreham with its timber cargo on March 24 at 1.30 p.m. Video: https://www.linkedin.com/feed/update/urn:li:activity:6511084241336430592/

Kiel Fjord closed for ship traffic after cargo sihp lost tons of timber

Wed Nov 06 09:54:18 CET 2013 Timsen

The whole night of Nov 6 the search for timber lost off the "Roseburg" the evening before on Kiel Roads lasted. Workers of the Technical Support Work (THW) recovered many of the 700 lost bundles which had a length of up to three meters off the Caterpillar Works in Friedrichsort. The ship had anchored off Kiel in the evening of Nov 5 in order to carry out some repairs. Due to a technical problem with the ballast water pumps the ship suddenly shifted to starboard during pumping operations. The vessel was in danger of capsizing, and an officer who was on the starboard bridge wing fell over board. He could be recovered 10 minutes later and was treated for hypothermia in hospital. He was expected to return on board on Nov 6. gesperrt. The anti pollution vessel "Scharhörn" and the emergency tug "Bülk" were alerted and tracked the about four tons driftwood. The Kiel Fjord was closed for ship traffic by the traffic control until the timber was so far recovered. The water police launched an investigation once the "Roseburg" was moored in the Scheer Port of Kiel, thereby concentrating on the technical installations responsible for the ship's stability. The remaining wood was to be surveyed by the insurance and to remain in Kiel or be stowed again for the further transport to England. German reports and photos: http://www.ndr.de/regional/schleswig-holstein/frachter279.html http://www.abendblatt.de/region/schleswig-holstein/article121594289/Holzfrachter-verliert-seine-Ladung-in-der-Kieler-Foerde.html http://www.kn-online.de/Lokales/Kiel/Havarie-auf-der-Foerde-Frachter-Roseburg-fast-gekentert http://forum-schiff.de/phpBB3/viewtopic.php?f=2&t=23#p97129

Cargo vessel threatened to capsize in Kiel

Tue Nov 05 23:13:57 CET 2013 Timsen

On Nov 5, 2013, the „Roseburg“ was in danger of capsizing off Friedrichsort in the Kiel Bight. The ship had developed a strong list around 5 p.m. on Holtenau Roads. The ship tilted so fast that the whole deck cargo of timfer splashed into the water. The crew was able to stabilize the ship. The anti pollution vessel "Scharhörn“ and an emergency tug attended and secured the drifting Wood which was expected to take the whole night. The vessel which had been enroute from Riga to Barrow-in-Furness was moored in the Scheer Port at the North Jetty at 8.30 p.m. and detained.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data