General information

IMO:
9208021
MMSI:
636018259
Callsign:
D5OX2
Width:
40.0 m
Length:
277.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Liberia
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
331.0° / 12.0
Heading:
331.0° / 12.0
Speed:
Max speed:
Status:
moving
Area:
Laccadive Sea
Last seen:
2020-07-09
50 min ago
Source:
T-AIS
Destination:
ETA:
Max Draught:
Last drought:
Last update:
45 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2020-06-19
2020-06-20
22h 45m
2020-06-04
2020-06-06
1d 10h 6m
2020-04-30
2020-05-03
2d 14h 45m
2020-04-27
2020-04-29
1d 12h 26m
2020-04-26
2020-04-27
20h 45m
2020-04-14
2020-04-15
1d 3h 49m
2020-04-04
2020-04-06
1d 17h 18m
2020-04-01
2020-04-02
1d 6h 49m
2020-03-29
2020-03-30
1d 9h 40m
2020-03-26
2020-03-27
1d 3m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Banda Aceh
2020-07-06
Enter
Malacca Straits - North
2020-07-02
Leave
Malacca Straits - Penang Island
2020-07-02
Enter
Malacca Straits - Port Klang
2020-07-02
Enter
Kukup Island
2020-06-30
Enter
Kukup Island
2020-06-13
Leave
Malacca Straits - Penang Island
2020-06-12
Leave
Note: All times are in UTC

Latest news

Sold to Breakers

Tue Jun 30 15:15:50 CEST 2020 BerndU

Sold to Alang Breakers

Allision in Antwerp

Sat Feb 15 21:46:01 CET 2020 Timsen

The 'E.R.Seoul' allided with the Berendrecht lock upon its departure from Antwerp on Feb 14 at 3.15 p.m. The vessel suffered significant damage to the hull and had to return to berth 418 for further inspections. The Berendrecht lock remained still operational. The container ship berthed at the Antwerp Shiprepair on Feb 15 at 9.30 a.m. for repairs. She sailed again on Feb 21 at 6.40 a.m., next headed to Hamburg, ETA Feb 22.

Container ship repaired in Antwerp

Fri Feb 14 19:33:21 CET 2020 Timsen

Due to technical issues and delayed repairs, the 'E.R. Seoul' was sailing behind the long term schedule from Europe. The repairs of the vessel have been completed on Feb 8, 2020, and the vessel which had entered the port of Antwerp on Jan 27, was waiting for days to be shifted towards her loading terminal PSA Antwerp. Due to the severe weather conditions in Antwerp, this shift was delayed and took place on Feb 14. At 6 p.m. the ship berthed in the Churchill Dock. Appropriate schedule recovery measures were currently under review.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data