General information

IMO:
9292943
MMSI:
572728220
Callsign:
T2CL6
Width:
20.0 m
Length:
133.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Tuvalu
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
261.0° / 0.0
Heading:
261.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Jeddah (Gulf Stevedoring North Container Terminal)
Area:
Saudi Arabia
Last seen:
2025-10-07
1 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
2 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2025-10-07
24m
2025-09-16
2025-09-18
1d 4h 9m
2025-09-15
2025-09-16
19h 40m
2025-09-07
2025-09-07
14h 42m
2025-09-05
2025-09-06
16h 10m
2025-08-27
2025-08-28
20h 4m
2025-08-16
2025-08-17
1d 1h 52m
2025-08-03
2025-08-04
22h 31m
2025-07-27
2025-07-27
10h 39m
2025-07-21
2025-07-21
16h 4m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Jeddah South
2025-10-06
Leave
Jeddah South
2025-10-02
Enter
Jeddah North
2025-10-02
Enter
Suez
2025-09-29
Enter
Port Said
2025-09-29
Enter
Port Said
2025-09-13
Leave
Ismailia Suez
2025-09-13
Leave
Note: All times are in UTC

Latest news

Detention in Mersin

Sat Sep 27 22:21:20 CEST 2025 Timsen

The "Zeynep" was detained on Sep 17, 2025, in Mersin with 24 deficiencies, ten of which being regarded as seriously and grounds for a detention: 1) Propulsion and auxiliary machinery - Propulsion main engine Not as required 2) Propulsion and auxiliary machinery - Auxiliary machinery Not as required 3) Propulsion and auxiliary machinery - Other (Machinery) Other 4) Pollution Prevention - Sewage Treatment Plant Not as required 5) Pollution Prevention - 15 PPM Alarm Arrangements' Not as required 6) Life saving Appliances - Lifeboats Inoperative 7) Living and working - Cleanliness of engine room Insufficient 8)) Fire safety - Fire detection and alarm system Inoperative 9) Fire safety - Fire doors/openings in fire resisting division Not as required 10) Emergency systems - Emergency lighting, batteries and switches Inoperative The vessel was released again on Sep 26 and left the port enroute to Port Sudan with an ETA as of Oct 2. https://www.facebook.com/share/p/14JdNtmqcV5/

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data