Allgemeine Informationen

IMO:
9406647
MMSI:
248431000
Rufzeichen:
9HA2362
Breite:
40.0 m
Länge:
300.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Malta
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
83.0° / 0.0
Kompasskurs:
295.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Tianjin (Tianjin Port Container Terminal (East Section))
Gebiet:
Bo Hai
Zuletzt empfangen::
2024-03-28
vor 5 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 1 Tag
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-03-27
16h 26m
2024-03-24
2024-03-25
1d 2h
2024-03-18
2024-03-18
3h 1m
2024-03-07
2024-03-09
2d 2h 27m
2024-03-03
2024-03-04
1d 22h 48m
2024-02-19
2024-02-20
19h 5m
2024-02-16
2024-02-17
23h 53m
2024-02-14
2024-02-15
10h 59m
2024-02-09
2024-02-10
14h 46m
2024-01-21
2024-01-24
2d 15h 27m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Kukup Island
2024-03-19
Abfahren
Malacca Straits - Port Klang
2024-03-18
Abfahren
Malacca Straits - Penang Island
2024-03-17
Abfahren
Malacca Straits - North
2024-03-17
Ankommen
Banda Aceh
2024-03-17
Abfahren
Strait of Hormuz
2024-03-10
Abfahren
Strait of Hormuz
2024-03-05
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

The CMA CGM RACINE was the first vessel to cross the New East Port Said side Channel

Sat Feb 27 12:09:34 CET 2016 arnekiel

CMA CGM, a leading worldwide shipping Group, is pleased to announce that the CMA CGM RACINE was the first vessel to cross the New East Port Said side Channel, during the Opening ceremony held on February, 24th. For this special occasion, Chérif Ismaïl, Egyptian Prime Minister, Saad El-Giuchy, Egyptian Minister of Transport, and Admiral Mohab Mamish, Chairman of the Suez Canal Authority were present. Thanks to this new side channel, vessels will have a 24-hour access to East Port Said instead of current 8-hour access. This will bring much more flexibility on berthing windows and less restriction due to the Suez Canal convoy for ships who want to sail directly to the Mediterranean Sea or to berth. The project was concluded in November 2015 and completed within a few months. The new channel is 9km long, 250m width and 18m depth. Vessels up to 16.6m draft are able to cross it.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data