General information

IMO:
9609964
MMSI:
219596000
Callsign:
OZHK2
Width:
34.0 m
Length:
196.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Denmark
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
274.0° / 0.0
Heading:
237.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Area:
North Sea
Last seen:
2024-04-26
1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
2 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-04-26
3h 13m
2024-04-25
2024-04-25
6h 23m
2024-04-24
2024-04-24
5h 1m
2024-04-23
2024-04-23
5h 40m
2024-04-21
2024-04-22
1d 4h 15m
2024-04-20
2024-04-20
5h 32m
2024-04-19
2024-04-19
5h
2024-04-18
2024-04-18
6h 50m
2024-04-17
2024-04-17
3h 53m
2024-04-16
2024-04-16
5h 45m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Humber entrance
2024-04-25
Enter
Humber entrance
2024-04-25
Leave
Humber entrance
2024-04-23
Enter
Humber entrance
2024-04-23
Leave
Humber entrance
2024-04-20
Enter
Humber entrance
2024-04-20
Leave
Humber entrance
2024-04-18
Enter
Note: All times are in UTC

Latest news

Allision in Esbjerg

Sun Feb 09 18:44:05 CET 2020 Timsen

On Feb 9, 2020, around noon the 'Ark Dania' allided with the quay in Esbjerg upon its arrival in Immingham due to fierce winds and sustained damage to the hull. A sailing ban has been issued until the hull damage has been repaired. The ship could not unload the almost 200 vehicles that the ship carries from England both because of the risen water level and the strong with speeds of 37 meters per second. Repairs to the 'Ark Dania' will be carried out at the Atlanta Quay in Esbjerg. The hull was punctured, sliced and dented above the waterline at starboard side on several meters. The roro ferry 'Misida' which was in lay up status in Vlaardingen, was mobilized to replace the 'Ark Dania' on the route to Immingham according to its schedulee. She left the port again after completion of repairs on Feb 14 at 8.45 p.m., arriving in Immingham again on Feb 15 at 3.15 p.m. Danish reports with photos: https://www.tvsyd.dk/esbjerg/storm-faar-dfds-skib-til-stoede-paa-kajen https://www.faergenyt.dk/ark-dania-ramte-kajen-i-esbjerg/?fbclid=IwAR1m5vtmNrTibnTGly58Gtp8nyKDNo08Keg0PvxUcSMzU0VIXuOGq3HNZQE

Three stowaways found in trailer

Sun Oct 30 14:32:32 CET 2016 Timsen

In the morning of Oct 27, 2016, the crew of the "Ark Dania", which was en route to Immingham, got a message from shore that on a camera three People had been seen which had entered the Ferry terminal and probably managed to get on board inside a Trailer. Captain Niels Vestergaard immediately launched a search and the crew succeeded to find the three stowaways. They defended themselves in every way, threatening to harm themselves, damage the ship or pose a risk to the crew. They were taken them to Esbjerg after in Immingham professional guards came on board to help on the return trip. The terminal has now further strengthened routines and guarding.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data