DAYscrapped
Course/Position
Latest ports
Latest Waypoints
Latest news
Beached
Beached at Aliaga 27.10.21 Picture before Beaching : https://www.instagram.com/p/CVo7Zt2oYA3/
Repair works at Finike Bay
The 'Day', while en route from Temryuk to Iskenderun, suffered a technical failure and dropped anchor at the Finike Bay on Dec 26, 2020. Repairs were started by the crew at the anchorage.
Structural failure in Hereke
The 'Day' 2516 gt (IMO: 8841591) suffered a structural failure in the cargo hold and pertinent equipment during cargo discharge operation after its arrival from Azov at Hereke on Oct 30, 2019. Repairs were carried out by stevedore duty teams upon completion of discharge operation. The vessel berthed in Tuzla on Nov 1 at 1.40 p.m.
Upload News