General information

IMO:
8917704
MMSI:
211222720
Callsign:
DJQO
Width:
8.0 m
Length:
27.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Germany
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
331.2° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moored
Location:
Area:
Germany
Last seen:
2024-01-24
92 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
92 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-01-08
2024-01-24
16d 6h 13m
2024-01-08
2024-01-08
3h 12m
2023-12-20
2024-01-08
18d 15h 37m
2023-11-23
2023-12-20
26d 10h 44m
2023-11-22
2023-11-23
1d 11h
2023-11-04
2023-11-22
17d 14h 32m
2023-09-20
2023-11-04
44d 22h 56m
2023-09-19
2023-09-20
22h 46m
2023-09-17
2023-09-19
1d 17h 24m
2023-09-17
2023-09-17
3h 45m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Holtenau
2024-01-23
Leave
Holtenau
2024-01-23
Enter
Holtenau
2024-01-16
Leave
Holtenau
2024-01-16
Enter
Holtenau
2024-01-16
Leave
Holtenau
2024-01-16
Enter
Holtenau
2024-01-09
Leave
Note: All times are in UTC

Latest news

Tug disabled by tyre

Tue May 16 12:50:42 CEST 2017 Timsen

The "Falckenstein" which is at present serving as a canal ferry on the Kiel Canal in Rendsburg was disabled by a tyre which fouled the propeller in the morning of May 16, 2016. The ship was stuck at the south shore in Osterrönfeld en route from the berth of the Water- and Shipping Authority in Rendsburg to the ferry berth at 7 a.m. when drift good got entangled in the propulsion. It managed to reach a berth at the heavy good terminal in Rendsburg where a diver was sent down to clear the propulsion from the obstruction in the foremidday. At 11.45 a.m. the ship was operating again.

Passenger carrying tug ran aground following engine failure in Kiel

Mon Oct 15 21:37:42 CEST 2012 Timsen

On Oct 15, 2012, around 6 p.m. the "Falckenstein“ ran aground off the Reventlou Pier in Kiel. The ship which was serving the Förde-route and was carrying passengers got stuck with slow speed due to engine trouble which kept it from being stopped in time. The master passed the pier and ran aground in a short distance of the sea promenade. The tug "Holtenau“ was called and pulled the disabled ship off the shallow and moored it at the Reventlou Pier where the passengers were disembarked. The "Falckenstein" was then towed to the SFK owned pontoon at the central railway station for surveys.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data