General information

IMO:
9267675
MMSI:
351780000
Callsign:
HPNE
Width:
32.0 m
Length:
199.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Panama
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
325.0° / 0.0
Heading:
327.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Arabian Sea
Last seen:
2021-04-22
15 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
6 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2021-04-13
2021-04-14
18h 25m
2021-04-06
2021-04-06
12h 3m
2021-03-31
2021-04-01
23h 30m
2021-03-30
2021-03-30
10h 23m
2021-03-26
2021-03-27
8h 51m
2021-03-25
2021-03-26
8h 23m
2021-03-23
2021-03-24
6h 27m
2021-03-19
2021-03-20
9h 50m
2021-03-18
2021-03-19
5h 4m
2021-03-13
2021-03-14
13h 48m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Banda Aceh
2021-04-19
Enter
Malacca Straits - North
2021-04-16
Leave
Malacca Straits - Penang Island
2021-04-16
Enter
Malacca Straits - Port Klang
2021-04-15
Enter
Kukup Island
2021-04-14
Enter
Hong Kong Approach
2021-04-06
Enter
Hong Kong Approach
2021-04-04
Leave
Note: All times are in UTC

Latest news

Detained by MCA for 2 days in April at Tyne

Fri May 17 09:32:25 CEST 2013 arnekiel

Date and Place of detention: - 26 April 2013, Tyne The vessel was detained in the Tyne as the crew were unable to demonstrate three way valve automatic operations and seven deficiencies were marked as ISM, which demonstrate there was objective evidence of a serious failure, or lack of effectiveness of the implementation of the ISM Code. The ISM deficiencies identified were fire doors were not self closing; there was a safety railing not rigged; the chart correction log was not up to date. There was no hand washing material at the galley sink or cleaning materials for galley surfaces; there was a lack of provisions on board and no fresh water testing had been carried out. Other deficiencies on board included there being no dates or information on food in storage and food found defrosting in hand washing sink. There was a crack in between the support bracket and deck, between casings on the upper deck. The vessel was released on 27 April 2013

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data