Allgemeine Informationen

IMO:
MMSI:
269057248
Rufzeichen:
HE7248
Breite:
11.0 m
Länge:
108.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
Switzerland
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
198.1° / 0.0
Kompasskurs:
37.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Antwerp (Waalsekaai)
Gebiet:
Belgium
Zuletzt empfangen::
2024-04-25
vor 3 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 4 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-24
16h 3m
2024-04-23
2024-04-23
4h 7m
2024-04-22
2024-04-22
16h 3m
2024-04-19
2024-04-21
2d 2h 34m
2024-04-19
2024-04-19
42m
2024-04-19
2024-04-19
10h 55m
2024-04-17
2024-04-18
21h 23m
2024-04-16
2024-04-16
5h 2m
2024-04-12
2024-04-15
3d 4h 14m
2024-04-12
2024-04-12
11h 13m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Boudewijn Locks
2024-04-23
Ankommen
Boudewijn Locks
2024-04-18
Abfahren
van Cauwelaert Locks
2024-04-16
Abfahren
van Cauwelaert Locks
2024-04-11
Ankommen
Antwerp Doel
2024-04-09
Ankommen
Berendrecht Locks
2024-04-09
Ankommen
Boudewijn Locks
2024-04-04
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Water too shallow for second asylum ship in Meppel

Wed Nov 02 10:56:35 CET 2022 Timsen

The second refugee ship, the 'Crucevita', has arrived in the Meppel port en route from Lelystad on Nov 1, 2022. The ship can accommodate 110 refugees. The intention was that the vessel would berth at Zomerdijk, but it turned out that the waterwas too shallow. The ship is therefore now in Staphorster waters. The bottom of the Meppeler Deep will be leveled in the coming days by the municipality of Meppel. New paving and utilities are currently being worked on at the Zomerdijk so that the ship is accessible. Extra paving has also been laid for parking spaces and the placement of office units, in which the staff will soon be able to work. The biggest challenge turned out to be staffing. Getting security guards is still the biggest challenge. The first refugees will arrive next week. Report with photo and video: https://www.rtvdrenthe.nl/nieuws/15084134/asielboot-kan-niet-aanmeren-in-meppel-door-lage-waterstand

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data