DIEVA
Die letzten Häfen
Die letzten Wegpunkte
Die neuesten Nachrichten
Detention in Gemlik
On May 28, 2025, the ' Dieva' was detained in Gemlik with 33 deficiencies, 21 of which being regarded as seriously and grounds for a detention: 1) Certificate & Doc - Records of seafarers daily hours of work or rest Missing 2) Certificate & Doc - Oil record book Not as required 3) Safety of navigation - Charts Missing 4) Safety of navigation -Voyage or passage plan Missing 5) Safety of navigation - Echo sounder Inoperative 6) Life saving Appliances - Distress flares Missing 7) Life saving Appliances - Lifeboats Inoperative 8)) Life saving Appliances - Buoyant apparatus Not as required 9) Living and working - Cleanliness of engine room Insufficient 10) Living and working - Gas instruments Inoperative 11) Living and working - Lighting (Accommodation) Missing 12) Water/Weathertight - Ventilators, air pipes and casings Not as required 13) Structural conditions -. Ballast, fuel and other tanks Cracked 14) Fire safety - Fire doors/openings in fire resisting division Not as required 15) Fire safety - Means of escape Blocked 16) Fire safety - Personal equipment for Fire safety Not as required 17) Emergency system - Enclosed space entry and rescue drills Not as required 18) Emergency system - Emergency lighting, batteries and switches Missing 19) Radio communications - Facilities for reception of marine safety information Inoperative 20) Radio communications - Other (Radio comm) Other 21) ISM - Ism certificate Not as required The vessel was released again on June 4 and proceeded to Altinova for repairs, where it arrived on June 13.
News schreiben