Allgemeine Informationen

IMO:
9861811
MMSI:
229248000
Rufzeichen:
9HA5313
Breite:
47.0 m
Länge:
294.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Tankship
Ship type:
Flagge:
Malta
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
161.9° / 0.0
Kompasskurs:
151.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Buetzfleth (Energos Force FSRU)
Gebiet:
Germany
Zuletzt empfangen::
2024-04-28
vor 2 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 3 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-03-19
40d 2h 47m
2024-03-11
2024-03-13
2d 12h 39m
2024-03-02
2024-03-11
8d 16h 12m
2024-02-28
2024-03-01
1d 8h 31m
2024-02-10
2024-02-12
2d 2h 18m
2024-01-25
2024-01-26
1d 2h 42m
2024-01-08
2024-01-10
2d 8h 24m
2023-12-30
2024-01-01
1d 4h 52m
2023-12-27
2023-12-28
1d 4h 35m
2023-12-09
2023-12-13
3d 14h 56m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Stade
2024-03-15
Ankommen
Glueckstadt
2024-03-15
Ankommen
Brunsbuettel
2024-03-15
Ankommen
Cuxhaven
2024-03-15
Ankommen
Elbe 1
2024-03-15
Ankommen
Wangerooge
2024-03-14
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

LNG carrier arrived in Stade wth police escort

Fri Mar 15 10:39:59 CET 2024 Timsen

The ''Energos Force' moored in the Stade industrial port, en route from Rotterdam, on the morning of March 15, 2024. A large contingent of police accompanied the ship on the Elbe. There was a protest with two inflatable boats. The four inmates expressed their protest” against the LNG terminal. The police picked up those involved a little later in the port of Kollmar. The "Energos Force" did not yet have any gas on board. According to the operator Deutsche Energie Terminal-Gesellschaft (DET), a test phase for the floating LNG terminal was initially underway. The terminal is then expected to supply gas to five million households per year. The "Energos Force" is the third of four ships chartered by the federal government to handle LNG tankers in the North Sea area in Stade, Wilhelmshaven and Brunsbüttel. The arrival was regarded as an important milestone in the district for security of supply and stabilization of gas prices in Germany and Europe. The district is also strengthening its position as an industrial and chemical location. The construction of the pier in Stade is considered the largest water-side construction project in Germany's ports. In addition to the floating terminal, the construction of an LNG terminal is planned in Stade and scheduled to be completed in 2027. Report with audio: https://www.ndr.de/nachrichten/niedersachsen/lueneburg_heide_unterelbe/Protest-begleitet-Ankunft-von-neuem-LNG-Terminal-in-Stade,energosforce100.html

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data