Allgemeine Informationen

IMO:
8769896
MMSI:
310588000
Rufzeichen:
ZCDZ6
Breite:
64.0 m
Länge:
90.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
Bermuda
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
225.8° / 0.0
Kompasskurs:
225.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
North Sea
Zuletzt empfangen::
2024-04-12
vor 7 Tagen
 
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 7 Tagen 
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2023-09-14
2024-04-06
205d 5h 27m
2023-05-01
2023-09-13
134d 22h 5m
2023-04-27
2023-04-27
2h 55m
2023-04-27
2023-04-27
2h 14m
2023-03-21
2023-04-26
36d 16m
2022-03-28
2022-03-30
2d 2h 52m
2022-02-11
2022-03-21
38d 3h 40m
2022-01-13
2022-02-10
27d 23h 26m
2021-10-08
2022-01-09
93d 2h 30m
2021-05-27
2021-05-27
1h 21m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

Accomodation platform punctured at least three times by anchor

Mon Nov 12 10:22:45 CET 2012 Timsen

After the "Floatel Superior" was moored at Vestbase, three large holes became visible in the floating tanks, which were obviously torn when an anchor struck against the steel. There was also a strong abrasion of paint caused by the anchor moving back and forth along the platform leg.In the afternoon of Nov 11 the Aak IRV in Kristiansund started rigging up in order to repair the damage to the "Floatel Superior". The Aak Group has about 30 employees in Kristiansund. Floatel International hoped the repairs of the rig will only take a week. Norwegian report with photo: http://www.tk.no/nyheter/article6336734.ece

Accomodation platform reached Kristiansund

Sun Nov 11 14:38:16 CET 2012 Timsen

The "Floatel Superior" reached Kristiansund late in the night of Nov 10. The owner company expected that it would be repaired and back in operation within one to two weeks. The accomodation platform had sailed the 70 nautical miles from the Njord Field to the oil base with its own power and with a crew of 38 on board. The rig was towed into the harbor in the run of Nov 10 and moored at Quay 6 of Vestbase. Under governance of Vestbase the Aak IRV will perform the actual welding work which started on Nov 11 with all available crew to get the job done. There were so far confirmed two holes in the ballast tanks. Representatives from both the owner company, police, Statoil and PTIL (Petroleumstilsynet) started a first inspection of the damage. Norwegian reports with photos: http://www.tk.no/nyheter/article6336007.ece http://www.nrk.no/nyheter/distrikt/more_og_romsdal/1.8391919

Rig via Bremsnesfjord to Vestbase

Fri Nov 09 09:48:23 CET 2012 Timsen

The "Floatel Superior" on Nov 8 was on its way to Kristiansund with its own power and was accompanied by two support ships. On Nov 9 at 10 a.m. it was west of Smøla and proceeding with a speed of 2.1 knots and expected at the oil base on Nov 10. The rig has 38 people on board. The extent of damage can only be found out during an inspection in a basin near Kristiansund. The weather in the Norwegian Sea was better than in the previous three days. The JRCC was monitoring the move towards Kristiansund.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data