Allgemeine Informationen

IMO:
9209063
MMSI:
235000141
Rufzeichen:
ZQGW3
Breite:
11.0 m
Länge:
49.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
United Kingdom
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
138.0° / 0.0
Kompasskurs:
145.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Inner Seas
Zuletzt empfangen::
2025-08-06
vor 7 Std
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 9 Std
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2025-06-29
2025-06-29
9h 14m
2025-06-28
2025-06-28
7h 40m
2025-05-20
2025-05-21
20h 7m
2025-04-21
2025-04-21
49m
2025-03-31
2025-04-01
12h 34m
2025-01-22
2025-01-23
13h 3m
2025-01-20
2025-01-20
3h 54m
2025-01-18
2025-01-18
9h 18m
2025-01-17
2025-01-17
4h 14m
2025-01-16
2025-01-16
5h 2m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

Sailings liable to disruption or cancelation

Thu Jul 31 20:55:47 CEST 2025 Timsen

Due to essential maintenance on the 'Lochnevis', operating on the route Mallaig-Small Isles on the evening of July 31, the scheduled sailings on Aug 1 were announced to be liable to disruption or cancelation at short notice by the operator CalMac.

Ferry needed essential repairs overnight

Fri Jul 11 09:44:32 CEST 2025 Timsen

The 'Lochnevis', serving on the route Mallaig-Small Isles, was in need of essential repairs on the evening of July 10. As a consequence, the morning services on July 11 were announced to be liable to disruption or cancellation at short notice by the operator CalMac. A passenger and vehicle charter has been sourced and would be available if required. On the morning of July 11, the repairs have been successfully completed, so that a normal service could be operated.

Ferry suffered bow trhuster trouble

Wed Feb 19 10:00:24 CET 2025 Timsen

On Feb 19, the 'Lochnevis', sailing on the route Mallaig-Small Isles, suffered an issue with the vessel’s bow thruster. Combined with adverse weather conditions, an amended timetable was operated with the ferry departing from Mallaig at 10:15 a.m., arriving in Eigg at 11:35 a.m., sailing from there at 11:45 a.m. and arriving back in Mallaig at 1:05 p.m.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data