Allgemeine Informationen

IMO:
9670406
MMSI:
235103165
Rufzeichen:
2HFE5
Breite:
13.0 m
Länge:
37.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
United Kingdom
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
188.9° / 0.0
Kompasskurs:
276.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Gravesend (Gravesend Port)
Gebiet:
United Kingdom
Zuletzt empfangen::
2024-05-31
vor 2 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 2 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-05-28
2d 19h 36m
2024-05-28
2024-05-28
3h 40m
2024-05-22
2024-05-28
5d 11h 33m
2024-05-22
2024-05-22
10h 13m
2024-05-21
2024-05-22
16h 33m
2024-05-21
2024-05-21
51m
2024-05-21
2024-05-21
2m
2024-05-20
2024-05-21
20h 44m
2024-05-09
2024-05-20
10d 22h 19m
2024-05-09
2024-05-09
2h 50m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Gravesend
2024-05-28
Ankommen
Gravesend
2024-05-28
Abfahren
Gravesend
2024-05-22
Ankommen
Gravesend
2024-05-22
Abfahren
Northfleet
2024-05-21
Ankommen
Northfleet
2024-05-21
Abfahren
Gravesend
2024-05-21
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

PLA’s £7million boat does the trick after storm damage closes pier temporarily

Sun Apr 03 22:20:17 CEST 2016 arnekiel

A busy London pier that was shut briefly after Storm Katie struck was reopened thanks to a new tidal Thames superboat. Our £7 million mooring maintenance vessel, London Titan, used her 20-metre extending crane arm to remove part of a damaged canopy which was overhanging the MBNA Thames Clippers stop. The pier had been shut for a day and a half, after Hurricane Katie struck. Titan’s crew, who were carrying out extensive repair works at nearby Greenwich ship tier, worked quickly to winch the canopy arm safely down onto the pier, before engineers ensured that the site could safely reopen. That meant thousands of MBNA Thames Clippers passengers could disembark there in time for Dynamo’s show. PLA’s Marine Manager Afloat, Michael Russell, said: “Other vessels on the river could’ve done the job Titan did, but I doubt any would have got there at such short notice. http://www.hellenicshippingnews.com/plas-7million-boat-does-the-trick-after-storm-damage-closes-pier-temporarily/

£7 million river maintenance vessel ready for a busier Thames

Sat Dec 05 08:58:45 CET 2015 arnekiel

With Thames passenger and freight statistics at record levels, the Port of London Authority (PLA) officially introduced its £7 million multi-purpose river maintenance vessel, London Titan, in a ceremony at Tower Pier today (Thursday, 3 December 2015). Officially named by Thurrock MP, Jackie Doyle-Price, London Titan will keep the river clear of obstructions and channels clearly marked for all to use. Titan has been specially built to be capable of working from Richmond in west London all the way out into the Thames estuary. Her work is vital on a river that is home to the UK’s second biggest port, busiest inland waterway for passengers and freight and a centre for sporting and recreational activity. http://www.hellenicshippingnews.com/7-million-river-maintenance-vessel-ready-for-a-busier-thames/

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data