Allgemeine Informationen

IMO:
7633143
MMSI:
219173000
Rufzeichen:
OYRA2
Breite:
25.0 m
Länge:
121.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
Denmark
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
111.0° / 0.0
Kompasskurs:
305.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Roenne (Rönne Port)
Gebiet:
Denmark
Zuletzt empfangen::
2024-04-25
vor 2 Min
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 3 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-24
21h 25m
2024-04-24
2024-04-24
5m
2024-04-23
2024-04-23
6m
2024-04-22
2024-04-22
6m
2024-04-22
2024-04-22
6m
2024-01-27
2024-04-22
86d 10h 23m
2024-01-26
2024-01-26
1h
2024-01-25
2024-01-26
1d 18h 41m
2024-01-24
2024-01-24
1h 12m
2024-01-19
2024-01-24
5d 2h 50m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Mukran
2023-10-21
Ankommen
Mukran
2023-10-21
Abfahren
Mukran
2023-10-14
Ankommen
Mukran
2023-10-14
Abfahren
Mukran
2023-10-07
Ankommen
Mukran
2023-10-07
Abfahren
Mukran
2023-09-30
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Repair of damaged engines taking longer than expected

Thu May 30 09:26:57 CEST 2013 Timsen

Since start of April 2013 the "Povl Ankor" has been sailing on half power as it has taken much longer to repair the two engines which were destroyed because they were not sufficiently warmed up before when they were started. The ferry was not expected to be able to sail at normal speed again before June 20 when the two damaged engines were expected to return to normal operating condition. The fourth engine will be completely repaired later. On three of its on the whole four engines the ferry will be able to sail fast enough to meet the sailing schedule.

No replacement for fast ferry due to engine trouble

Tue Mar 19 09:55:03 CET 2013 Timsen

The "Povl Anker" suffered engine trouble on Mar 19, 2013, and was unable to replace the fast ferry "Villum Clausen", which could not cope with the stormy seas, on the route between Ronne and Ystad as planned. Instead the "Hammerodde" has been inserted. The "Povl Anker" should have sailed to Ystad at 06.30 a.m., but due to technical problems on one of it's main engines, had to remain sidelined in Rönne. It was hoped the "Povl Anker" should be ready again for the trip from Ronne to Ystad at 7.30 p.m.

POVL ANKER 7633143

Fri May 06 18:15:33 CEST 2011 Timsen

One port worker suffered a broken hand, and another lost part of at least three fingers on May 1, 2011, when they were caught in a rope during a manoever of the "Povl Anker" at Rønne harbour. The accident happened when the vessel moved from the cruise pier to its usual berthe, and the man's hand got trapped between a bollard and rope. The Bornholm Ferry Company has now received an order from the Labour Inspectorate to take control of procedures for rope handling at the port immediately. They were not in order, the day the accident occurred, said Karsten Christensen of Labour Inspection. - There have been a misunderstanding in relation to the instruction set for handling beliefs, and causes he has got his hand caught in a time when it normally would not be possible, "explains Karsten Christensen. The ferry has the opportunity to make objections to the injunction. Anhören Umschrift Neu! Klicken Sie auf die oben stehenden Wörter, um Alternativübersetzungen zu sehen. Schließen Wörterbuch

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data