Allgemeine Informationen

IMO:
7527796
MMSI:
232001270
Rufzeichen:
GWOS
Breite:
12.0 m
Länge:
68.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
United Kingdom
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
81.0° / 0.0
Kompasskurs:
82.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
NORTH ATLANTIC OCEAN
Zuletzt empfangen::
2024-04-19
vor 1 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 4 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-19
2024-04-19
4h 13m
2024-04-18
2024-04-19
14h 24m
2024-04-18
2024-04-18
4h 12m
2024-04-17
2024-04-18
14h 6m
2024-04-17
2024-04-17
4h 24m
2024-04-16
2024-04-17
14h 29m
2024-04-16
2024-04-16
4h 4m
2024-04-15
2024-04-16
14h 6m
2024-04-15
2024-04-15
4h 3m
2024-04-14
2024-04-15
23h 41m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Isle of Scilly
2023-06-13
Ankommen
Isle of Scilly
2023-06-13
Abfahren
Isle of Scilly
2021-06-30
Ankommen
Isle of Scilly
2021-06-30
Abfahren
Isle of Scilly
2020-03-21
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Evacuation from Isles of Scilly following ferry breakdown

Mon Sep 02 12:39:54 CEST 2019 Timsen

An evacuation from the Isles of Scilly was underway as 18 emergency flights were scheduled to bring stranded holidaymakers back to the mainland after the "Scillonian III" broke down on Aug 28, experiencing a double engine failure while on its way from the mainland forcing it to turn back to Penzance. The only other way to get on and off the island 28 miles off of Land’s End was via small aircraft that seat a maximum of 18 people. The breakdown meant hotels were left overflowing and tourists stranded. In a bid to get 400 of the 1,300 ferry customers that were affected by the breakdown home, Isle of Scilly Travel scheduled 18 flights on Sep 1. The "Scillonian III" was also back in action, taking its first trip since the incident at 3.30 p.m. and was expected to do a double sailing on Sep 2 to cope with the backlog of customers. There were an additional 34 Skybus Islander and Twin Otter flights put on between Aug 29 and the evening of Aug 31. A further 700 passengers that were due to have sailed have been were transferred via scheduled or additional flights.

Scillonian remains sidelined

Fri Aug 30 11:41:16 CEST 2019 Timsen

The "Scillonian III" remained sidelined in Penzance on Aug 29 after it suffered a technical failure at sea on Aug 28 and was forced to return to the port when both engines broke down. The Isles of Scilly Travel worked to get passengers booked to travel Wednesday on its flights from Land's End Airport but announced that the passengers' trips on Aug 29 and 30 would not take place. The company was aiming to be back on schedule on Aug 31, whilst the engineering team has been working relentlessly on fixing the fault. All passengers were avised not to make the journey down to Penzance by the travel teams.

Passenger ferry broke down

Wed Aug 28 13:37:18 CEST 2019 Timsen

The "Scillonian III", enroute from Penzance and the Isles of Scilly was returning to Cornwall following a technical issues with both engines on Aug 28, 2019, The passenger ferry was escorted back to Penzance by the Sennen Lifeboat and arrived in port at 2 p.m.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data