SE CARDI
Kurs/Position
vor 41 Min
Die letzten Häfen
Die letzten Wegpunkte
Die neuesten Nachrichten
Rudder damage in bottom touch
The 'SE Cardi', being fully loaded with 36,000 tons logs, bound for Sanshui, had a bottom touch during unmooring operations from Pier C of the port of Montevideo on April 24, 2021. The vessel was subsequently shifted to the service area at Punta del Este and moored in position 34 58 00S, 55 04 00W, where an underwater inspection was carried out on April 26, which revealed a misaligned rudder at starboard side. It was being analysed if the repairs were to be carried out in the drydock at Montevideo. As of May 15 the ship remained stationary off the port.
News schreiben