Allgemeine Informationen

IMO:
8756916
MMSI:
538002098
Rufzeichen:
V7GH9
Breite:
55.0 m
Länge:
60.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
Marshall Islands
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
360.0° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Persian Gulf
Zuletzt empfangen::
2024-03-14
vor 53 Tagen
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 257 Tagen
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2023-08-13
2024-01-25
164d 19h 56m
2022-01-17
2022-02-04
18d 8h 51m
2021-12-18
2022-01-07
19d 14h 32m
2021-04-23
2021-10-16
176d 13h 11m
2021-02-15
2021-04-13
57d 8h 8m
2021-01-29
2021-02-11
13d 1h 47m
2020-09-02
2021-01-15
135d 4h 10m
2020-06-20
2020-07-07
17d 21m
2019-11-29
2020-06-10
193d 22h 6m
2019-11-19
2019-11-19
32m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

Investigation into fatal cran collapse

Tue Mar 24 09:59:42 CET 2020 Timsen

On March 16, 2020, a crane collapsed along with the boom and cabin on the 'Seafox Deema' into the water while shifting pipe tools ontp a supply vessel off the Qatari coast, killing the crane operator, reportedly a 34 year old Indian national. A diving operation followed, which later confirmed the fatality. While the detailed investigation was still ongoing, from a preliminary analysis the causes of th eaccident were to be sought in the structural failure of the pedestal crane. The jack-up barge was working for Qatargas’ Barzan pipeline replacement project, when the accident happened. Seafox was the operator of the jack-up vessel that was working on a sub-contract from Saipem, the main engineering, procurement, construction and installation contractor for Qatargas’ Barzan pipeline replacement project. No damage has been reported on the topsides and subsea assets involving the Barzan project.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data