Allgemeine Informationen

IMO:
9937282
MMSI:
229653000
Rufzeichen:
9HA5546
Breite:
24.0 m
Länge:
190.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Malta
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
154.3° / 0.0
Kompasskurs:
154.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Gulf of Maine
Zuletzt empfangen::
2025-07-10
vor 7 Tagen
 
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 7 Tagen 
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2025-07-07
2025-07-10
2d 14h 45m
2025-07-02
2025-07-02
10h 37m
2025-07-01
2025-07-01
55m
2025-06-30
2025-06-30
30m
2025-06-28
2025-06-28
1h
2025-06-26
2025-06-28
1d 11h 8m
2025-06-19
2025-06-24
4d 12h 17m
2025-06-12
2025-06-12
58m
2025-06-12
2025-06-12
40m
2025-06-11
2025-06-11
20h
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
SPRC Approach
2025-05-30
Ankommen
SPRC Approach
2025-05-27
Abfahren
La Plata Approach
2025-05-09
Abfahren
La Plata Approach
2025-04-15
Ankommen
Dover
2025-03-14
Ankommen
Calais
2025-03-14
Ankommen
Skagen
2025-03-12
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Chief engineer medevaced

Mon Apr 14 12:58:00 CEST 2025 Timsen

On the morning of April 12, 2025, the MRCC in Uruguay received a call from the 'Shipka', bound for the Uruguayan port of Nueva Palmira, stating that the 43-year-old chief engineer had suffered a heart attack that had been ongoing for two hours. The on-duty Search and Rescue (SAR) doctor advised to medevac the man quickly. Two naval aircraft were immediately deployed for the task, a Beechcraft B200 to monitor, and a Leonardo AB412 helicopter to hoist the patient. Both units departed from Naval Base No. 2 with a crew consisting of a pilot, a co-pilot, a doctor, and two rescue swimmers. After the patient was pulled aboard, the appropriate tests are performed, and the AB 412 set off for the Montevideo Police Hospital. The patient is disembarked at the hospital and then transported by ambulance to another health facility, where he arrived conscious and stabilized. Report with photo: https://www.defensa.com/uruguay/armada-uruguaya-evacua-tripulante-carguero-maltes-tras-evento

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data