Beached at CHittagong 23.04.24
News
ABDULLAH
After an awful 31-day journey at the hands of Somali pirates, the 'Abdullah' with 23 crew members on board, and loaded with 55,000 tons of coal, arrived safely at the Al Hamriya Port in Dubai on April 22 at 4.30 p.m. Bangladesh time, bringing an end to the voyage, during which, on March 12, it was hijacked in the Indian Ocean while en route from Maputo to the United Arab Emirates. The Kabir Group, the parent company of SR Shipping and the owner of the 'Abdullah', verified the vessel’s safe arrival. After the hijack, the pirates reportedly demanded a ransom of $5 millionduring the early stages of negotiations for the crew’s release. The process entailed several discussions, with the ship’s owners, SR Shipping Limited, working relentlessly to ensure the crew’s safe return. The crew was ultimately released on April 13, and the ship began its journey to Al Hamriya Port, arriving there after eight days of navigation. Captain Mohammad Abdur Rashid stated that all 23 crew members were safe and sound. To crew members will fly back to Bangladesh, while the others will remain on board to await the end of the unloading procedure.
Walvis Bay
NAMPORT’s new container terminal will be officially inaugurated on 2 August, and normal operations are expected to start on it on 24 August. The new terminal, constructed at a cost of N$4 billion, is expected to increase container handling capacity from the current 355 000 twenty-foot equivalent units (TEUs) to up to 1 005 000 TEUs. Firstly, there will be a shutdown on 17 August of container operations in the port to start relocations to the new terminal. The equipment to be relocated include rubber-tired gantries and mobile harbour cranes, while reach stackers, haulers and forklifts will move the containers.
Hanjin Subic Shipyard
The 300-hectare shipyard of Hanjin Philippines may be taken over by several shipping companies that would transform it into a major global port, Trade Secretary Ramon Lopez said in a chance interview recently. He said the shipyard could be a sprawling multipurpose mixed-use port facility that would be jointly operated by several players. This, he said, is one of the proposals received by Hanjin creditors for the development of the shipyard after Hanjin Philippines declared bankruptcy early this year. “It’s a good masterplan that has been proposed and it is targeted to be implemented this year,” Lopez said. He declined to name the companies but hinted that these include foreign players. Another source said creditors are in negotiations with an American and a Japanese company. Officially, Hanjin has fully shut down just this month, ending the last of its remaining maintenance operations, sources said. As of this writing, the creditors have not made any official announcement yet regarding the final plans for the shipyard.
COASTAL RENAISSANCE
The noon sailing of the 'Coastal Renaissance' on April 21, 2024, was delayed leaving Swartz Bay on Monday due to a medical emergency. Ambulance paramedics were called to assist the affected passenger. The delay lasted 54 minutes. No further details were available.
MV KARAR
After three days of preliminary questions, the trial regarding the drug seizure aboard the 'Karar' faced the beginning of a key phase on April 22: the interrogations of the accused. The 14 crew members from Nepal and Bangladesh of the ship, which was transporting the 3.8 tons of cocaine, who will be released this week after four years in prison at the end of the maximum period of preventive detention, will be the first to testify. In the session, six of them already did so, including the captain, who, like the rest, confessed his guilt. Alim Ullah, the 48-year-old Bangladeshi, acknowledged that, after leaving Panama, they loaded the drugs on the high seas off the coast of Colombia and that the instructions were to take them to Vigo, where they were to land it about 350 nautical miles from the Olívic city. Along with the crew, Bueu resident José Manuel Blanco Gestido was on the ship, the only Spaniard on board, whom the captain and the other defendants who testified have incriminated by indicating that he was in charge of supervising the illicit cargo. Given the exceptional situation that the entire foreign crew was experiencing due to their imminent release – the maximum period of deprivation of liberty expires on April 25 at dawn – the prosecutor accepted that the interrogations of the 28 accused would begin with these sailors. The intention of their defense lawyers – given that, lacking economic means and roots in Spain, they will be welcomed in shelters spread across several Galician provinces – is to be excused from attending the trial sessions until the final day. Alim Ullah, the captain, was the first to testify. With the help of an interpreter. He confessed his participation in the drug trafficking operation that failed when at 6:20 a.m. on April 25, 2020, the “Karar” was boarded with the cache inside. The rest of the interrogated crew members also admitted their guilt: Mohammed Iman Sharif, Mohammed Ataur Rahman, Altaf Hossain, Mahfuzul Hoque and Tamang Kiran, all from Bangladesh except the last one, a Nepalese, as well as the remaining eight sailors who was to testify on April 23. All initially face, according to the prosecutor's provisional qualification document, 13,5 years in prison. They related how on the bridge of the “Karar” there was a nautical chart with the coordinates in pencil about the unloading point. When they left their countries of origin, several of them stressed, they were unaware that the voyage was to transport drugs, but already in Panama, where they left, they knew the illicit purpose of the trip and knew that they were carrying bales of cocaine on the ship. Another crew member reported that, after several days of crossing, they loaded the drugs in front of Colombia, a task that took them one or two hours. Other defendants gave more details about this moment, such as the electrician, the only one who did not need an interpreter. To load the bales they used a crane. It was the middle of the night, they were on the high seas and several boats with the drugs approached them. The only Galician who was on board wrote down with a pen in a book and all the bundles were stored in a tank, which was closed with screws and nuts. that Blanco Gestido, he said, secured with a flange. The Nepalese Tamang Kiran was the one who had contact with the outside world through satellite phone. He was speaking with a compatriot named Lama: he is not prosecuted in the case, but, according to the statements, he was one of the leaders in the illicit operation. Settled between Panama and Colombia, he was at the meeting prior to the departure of the “Karar”. Report with photo: https://www.farodevigo.es/gran-vigo/2024/04/22/capitan-karar-confiesa-cargaron-cocaina-colombia-destino-vigo-101392831.html
Visakhapatnam
With further development to its existing solid European products, Ocean Network Express (ONE) has announced the launch of a new direct service, the Indian Ocean Service 3 (IO3), which covers South East India, Mediterranean, and North Europe. The new product will offer new port coverage and boost reliability to a wider range of direct port call options to ONE’s valued customers. It will also further expand ONE’s already comprehensive service offerings and allow its clients to enjoy greater choice while bringing efficiency and additional values to the supply chain. The first sailing of the loop is now expected to start from 26th October 2019. IO3: Indian Ocean Service 3 Rotation: Visakhapatnam – Krishnapatnam – Chennai – Tuticorin – Colombo – Cochin – Damietta – Piraeus – Rotterdam – London Gateway – Hamburg – Antwerp – Le Havre – Damietta – Jeddah – Colombo – Visakhapatnam (Fixed day weekly service, 63-day rotation)
Callao
APM Terminals has become the first Peruvian port to introduce a customer platform that logs, streamlines and coordinate General Cargo operations in the port of Callao. During the pilot phase, the platform, which was developed together with maritime and customs agents, enabled users to complete transactions 67% faster and operations were completed 12% faster. APM Terminals Callao invested nearly USD 1 million in the implementation of MOST, a new state-of-the-art platform that can be used by maritime agents, customs agencies and carriers, among others. MOST can be used to register cargo and view real-time information, make online payments and generate authorizations for the loading and unloading of all types of General Cargo, from anywhere, anytime. The platform is a clear milestone in the efficient management of port logistics using world-class technology.
MFV OLIVIA GRACE
The Moelfre ALB was mobilized on April 21, 2024, at 12:35 p.m. to the 'Olivia Grace', whic hwas drifting approximately 12 miles North of Puffin Island towards the shipping lanes and following a Pan Pan urgency call from the Holyhead Coastguard. The lifeboat launched and was on scene within 25 minutes. Once on scene, it was discovered that the vessel's derricks were stuck in the down position and scallop dredges hanging approximately five meters beneath the surface. The ALB and crew stood by while the crew made several attempts to recover the fishing gear manually. Due to the sheer weight of the equipment, attempts to recover the dredges and stow the beams were unsuccessful. With the vessel in its current state and with the risk of fouling its gear on the seabed, towing to its home port of Porth Penrhyn was not feasible. The coxswain transferred a crew member to improve communications and requested that the vessel jettison the fishing gear and manually stow the large derricks. This request was denied as they didn't have the equipment onboard to cut or remove the wires from the winches or suitable equipment to mark the dredges for future recovery. As there was no immediate risk to life, and the vessel had full electrical power and all navigational aids for safety, it was deemed by Coxswain and Coastguard to be a commercial tow with specialist equipment required to remove the fishing gear and derricks. Following lengthy discussions between the Coastguard, Coxswain, and owners, it was agreed that the lifeboat would stand by and provide safety cover while commercial recovery options were discussed. If required, it would connect a tow should the situation change and the vessel drift into danger. Although there was no response from the coastguard's Pan Pan call, it was later discovered that the scalloper's sister vessel 'BS 89' was also working in the area. The owner later instructed the sister vessel to provide support and assistance. Once it arrived, they transferred some lifting equipment over with ropes and buoys to jettison the dredge. Following several hours of work, the fishing gear was lowered to the seabed. And the sister vessel connected a tow, while the crew of the trawler began work to manually recover the beams and derricks on their way back to Porth Penrhyn. Once safely underway, the Coastguard released the lifeboat and crew after eight hours at sea. Report with photos: https://rnli.org/news-and-media/2024/april/23/rnli-moelfre-eight-hours-at-sea-to-assist-fishing-vessel
HUNTER
The police have identified the body, which was found in the trawl of the trawler 'Kongsfjord' on April 12, 2024. On April 22 the police stated that it was Latvian Romans Solovjovs (38), who was found south-east of Svalbard. The next of kin have been notified. There was no final autopsy report, but the cause of death was stated to be drowning. The Havøy Kystfiske was grateful for the discovery of Solojovs and expressed their thanks for the efforts of the crew of the trawler for finding and bringing the deceased ashore. They hoped that this finding would give the police the answers they need to close the investigation, and bring some form of closure to the Solovjovs' family. Solovjovs was reported missing to the police following a report of a man overboard on the snow crab vessel "Hunter" off Svalbard on Jan 30, 2023. According to the accident report from February 2023, Solovjovs fell overboard while preparing the rails. Following the accident, the Accident Investigation Board notified the Norwegian Maritime Directorate of what they believed to be safety-critical conditions on board. As a result, the ship was detained in Tromsø until orders from the Norwegian Maritime Directorate were rectified. In that connection, all certificates were confiscated and declared invalid due to serious security discrepancies. The background was precisely the fatal accident. Owner Jøran Helde in Havøy Kystfiske, who owns the vessel, complained about this decision from the directorate. He then stated that the shipping company disagreed with a large number of findings in the audit report, and that it was therefore appealed. The case has not been finally decided. The ship remained docked in Ålesund. The shipping company had to pay half a million Norwegian crowns after it was discovered that the ship had too many foreign employees in the crew.
Rio de Janeiro
ICTSI subsidiary ICTSI Americas BV has acquired 100% of the shares of Libra Terminal Rio S.A. (Libra Rio) to run the Terminal de Contêineres 1 (T1Rio) container terminal in the Port of Rio, Brazil. Libra Rio holds the concession rights to operate, manage and develop T1Rio and was acquired by ICTSI from Boreal Empreendimentos e Participações SA. The deal to take over the port container terminal concession was disclosed to the Philippine Stock Exchange, reported Manila Standard. ICTSI said: “The parties will work to sign a share purchase agreement in due course.” Concession until 2048
Limassol
Two and a half years after taking over the operations of the Multi-Purpose and the New Cruise Terminals at the Limassol port, DP World Limassol on Wednesday presented the upgrades and investments in infrastructure and equipment. The company said that it had acquired brand-new equipment in January 2019 as part of an ongoing upgrade of the Limassol port infrastructure. The new machinery was put into operation in March 2019, following intensive training of staff and has contributed to speeding up operations at the Multi-purpose port terminal. More specifically, the new equipment includes: A new, high-tech LHM 420 mobile harbour crane, with maximum lifting capacity of 144 tons and radius of 54 metres enhancing the efficient handling and transportation of bulk cargo, general cargo, containers, oil and gas.